Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Civil Engineering
  5. ›Hill Lane Paving Improvements

Town of Little Elm·Texas

Hill Lane Paving Improvements

Closes 11/25/2025$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Little Elm is seeking bids for the Hill Lane Paving Improvements project, which includes approximately 12,820 SY of 8” Continuously Reinforced Concrete Pavement, 3,675 LF of Storm Drain, Traffic Signal improvements, and landscape amenities. The project is located on Dickson Lane to Oak Grove Parkway (FM720). A non-mandatory pre-bid conference was held at Little Elm Town Hall on November 10th at 2:00 pm. Bidders must submit a bid bond in the amount of five percent (5%) from a reliable Surety Company as guarantee that the Bidder will enter into a contract and execute bond and guarantee forms provided within ten (10) days after notice of award of contract to him. • The project includes paving improvements, storm drain installation, traffic signal improvements, and landscape amenities. • The project is located on Dickson Lane to Oak Grove Parkway (FM720). • A non-mandatory pre-bid conference was held at Little Elm Town Hall. • Bidders must submit a bid bond in the amount of five percent (5%) from a reliable Surety Company. • The bid bond must be received prior to bid opening.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Rebecca Hunter(Purchasing Manager)

[email protected]

(214) 975-0411

Key dates

Opened
10/30/2025
Questions due
11/13/2025
Pre-bid meeting
11/10/2025
Closes
11/25/2025

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
2026-01 Addendum 3

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work. The project includes approximately 12,820 SY of 8” Continuously Reinforced Concrete Pavement, 3,675 LF of Storm Drain, Traffic Signal improvements, and landscape amenities. The cost of such a project can vary widely depending on factors such as labor costs, material costs, and equipment costs. However, a rough estimate for a project of this scope could be in the range of $5 million to $15 million. This estimate is based on industry averages for similar projects and takes into account the complexity of the work, the location, and the materials required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Bluffton·South Carolina

Top match · 68%

Holly Hill Lane Road Extension IFB

Closes 11/24/2026Opened 10/21/2026

Lexington County·South Carolina

66% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

Nevada Government·Nevada

65% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Charlotte·North Carolina

65% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

65% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

Charleston County·South Carolina

64% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Charlotte·North Carolina

64% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

LA Public Works Engineering Bureau·California

64% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

North Carolina Town of Knightdale·North Carolina

64% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

City of Smithville·Missouri

64% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

NYS East Fishkill, Town of·New York

63% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Idaho Transportation Department·Idaho

63% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

City of Charlotte·North Carolina

63% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Ontario·California

63% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Village of Gurnee·Illinois

63% match

Public Works Paving Improvements Project

Closes 11/18/2026Opened 10/20/2026

Camden County·New Jersey

63% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Ohio City of Westerville·Ohio

63% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Nevada Government·Nevada

63% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Missouri Department of Transportation·Missouri

63% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

City of Richmond Government·Virginia

63% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Town of Westwood·Massachusetts

63% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Calhoun County Board of County Commissioners·Florida

63% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Lake County, CA·California

62% match

South Main Street and Soda Bay Rd Widening and Bike Lanes Project

Closes 11/30/2026Opened 10/31/2026

Town of South Hill·Virginia

62% match

IFB FY27-01: Asphalt Overlay & Traffic Marking

Closes 11/18/2026Opened 10/21/2026

City of Morgan Hill·California

62% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026