The City of Sacramento is seeking qualified contractors to develop Phase 7 (“Great Meadow”) of the North Natomas Regional Park. The work includes site clearing, grading, erosion‑ and sediment‑control, demolition of existing curbs, installation of concrete walkways, irrigation systems, landscaping, turf hydro‑seeding, and post‑construction maintenance. The contract is a fixed‑price, “at‑risk” bid with a base‑bid estimate of $671,114 and optional additive alternates that could bring total value to roughly $1.66 million. The project must be completed in approximately three weeks of core construction plus a 50‑day plant‑establishment period, with liquidated damages of $1,000 per day for late completion. The contractor must provide a 10 % bid bond, 100 % performance and payment bonds, and carry required insurance. Compliance with California prevailing‑wage statutes, a 5 % Local Business Enterprise participation requirement, and a detailed Stormwater Pollution Prevention Plan (SWPPP) is mandatory.
• Core scope: grading, fine‑grading, erosion control, concrete curb and walkway installation, irrigation, planting, and hydro‑seeding of 5.32 acres.
• Required certifications: CA Class A and C‑27 contractor licenses, DIR public‑works registration, prevailing‑wage compliance, and SWPPP implementation (Risk Level 2).
• Timeline: bid submission by July 1 2026; construction start within 15 days of Notice to Proceed; 30 working days for substantive work and 50 calendar days for plant establishment.