The City of Arabi, Georgia is seeking bids for the construction of a 0.1 MGD Wastewater Treatment Facility. The project includes the installation of a pre-engineered post-tensioned concrete tank and foundation, wastewater equipment, electrical work, a sludge wasting facility, and related concrete work. The project also involves the installation of two pump stations and approximately 2170 linear feet of a 4” HDPE effluent force main. The time of performance will be 270 days, and payment will be made monthly based on the progress of construction.
• The project consists of providing all labor, materials, supplies, equipment, transportation, supervision, overhead, and profit.
• The construction of a 0.1 MGD Wastewater Treatment Facility is the main objective of the project.
• The project includes the installation of a pre-engineered post-tensioned concrete tank and foundation.
• The installation of wastewater equipment, including electrical work, is part of the project.
• A sludge wasting facility and related concrete work are also included in the project.
• The installation of two pump stations and approximately 2170 linear feet of a 4” HDPE effluent force main are part of the project.