The project involves the complete removal of an existing bridge and construction of a new structure over 170th Street in Brown County, KS. The scope includes extensive earthwork, concrete placement, reinforcement steel installation, steel pile driving, and ancillary items such as slope protection, pavement, guard rail, aggregate base, HMA, and erosion control. All bids must be submitted sealed to the Brown County Clerk’s Office by the deadline, and the bid documents are available for inspection at the County Road and Bridge Department, BG Consultants, and Drexel Technologies.
• Removal and replacement of the existing bridge with new steel and concrete structures.
• Significant earthwork (≈1,354 CY total) and compaction, plus placement of 293.1 CY of Grade 4.0 concrete.
• Installation of 63,740 lb of reinforcing steel, 1,223 LF of steel piles, and associated roadway improvements (guard rail, pavement, aggregate base, HMA).
• Required bid submission at the County Clerk’s Office by 2 PM on June 22, 2026; bids will be opened publicly thereafter.
• Contact for technical queries: Brady Hedstrom, P.E., Project Engineer (email provided).