Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›MA-000-261-001 (SBR) Refurbish 50,000 Gallon 100’ Water…

Maryland Department Of General Services·Maryland

MA-000-261-001 (SBR) Refurbish 50,000 Gallon 100’ Water Tower at Thomas B Finance Center (IQC)

Closes 11/5/2025$200k – $400kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the complete rehabilitation of a 50,000-gallon, 100-foot-tall elevated potable water storage tank. The scope of work includes surface preparation and recoating of the interior and exterior tank surfaces, replacement of fill controllers and associated booster pumps and backflow preventers, fencing replacement, electrical and lighting system verification, cathodic protection system testing, containment measures, repairs, and certification. The contractor must ensure that the work is completed within 180 calendar days of notice to proceed and that the facility always has an uninterrupted water supply during construction. The key requirements for the contractor include: • Being SSPC-QP1 and QP2 certified for field application of protective coatings and industrial hazardous paint removal • Employing NACE Certified Coating Inspectors to oversee and document coating application • Providing labor, materials, equipment, and disposal required for project completion • Ensuring compliance with OSHA standards, AWWA D102, SSPC standards, NSF/ANSI 61 and NSF/ANSI/CAN 600 potable water coating requirements, local building codes, and manufacturer’s installation instructions • Maintaining continuity of operations and ensuring reliable potable water availability throughout the duration of the project • Providing operation manuals, documentation, and warranty information for all equipment installed • Attending a walkthrough with the Using Agency Representative and Project Manager at the conclusion of the work

Attached files

Contact

Deborah Pilker(Procurement Officer)

[email protected]

Key dates

Opened
9/30/2025
Pre-bid meeting
10/15/2025
Closes
11/5/2025
Duration
180 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
BPM053185

Budget estimate

$200,000 – $400,000

Based on the project cost class, which is estimated to be between $100,000 and $500,000, the budget for this project is likely to be in the range of $200,000 to $400,000. This estimate takes into account the scope of work, which includes coating, mechanical, and electrical work, as well as the requirement for containment and waste disposal. The actual budget may vary depending on the complexity of the project and the contractor's bid.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Medina County, OH Sanitary Engineering·Ohio

Top match · 74%

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

City of Lime Springs·Iowa

74% match

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning 26X.143612

Closes 11/19/2026Opened 10/29/2026

City of Holly Grove·Arkansas

71% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

71% match

North Shore Regional 911 Call Center Water Leaks Renovation

Closes 11/6/2026Opened 10/7/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

71% match

North Shore Regional 911 Call Center Water Leaks

Closes 11/20/2026Opened 10/7/2026

State of Michigan·Michigan

71% match

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

City of Neptune Beach·Florida

71% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

U.S. Department Of Health And Human Services·California

70% match

Cooling Tower Refurbishment - Three (3) Cells

Closes 11/2/2026Opened 10/26/2026

University of Massachusetts System·Massachusetts

70% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

Little Blue NRD·Nebraska

70% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Chennault International Airport Authority·Louisiana

70% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

Massachusetts Division of Capital Asset Management and Maintenance·Massachusetts

69% match

EPS2401 EPS - North Shore Regional 911 Center Water Leaks, Middleton, MA

Closes 11/20/2026Opened 10/7/2026

Omaha Public Schools·Nebraska

69% match

Marrs Cooling Tower Replacement

Closes 12/1/2026Opened 10/26/2026

U.S. Department Of Defense·Pennsylvania

69% match

RM16-1405 BUILDING 592 RENOVATIONS

Closes 12/1/2026Opened 10/28/2026

Massachusetts City of Medford·Massachusetts

69% match

IFB 27-0087 100 Lead Service Line Replacements

Closes 11/12/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

69% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

New York City Department of Environmental Protection·New York

69% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

City of South Hutchinson·Kansas

69% match

2025 Water Tower Improvements for the City of South Hutchinson

Closes 11/18/2026Opened 10/28/2026

City of Charlotte·North Carolina

69% match

Elevated Water Tank Rehabilitation

Rolling / TBD closeOpened 1/12/2027

City of Hanska·Minnesota

69% match

Hanska City 100,000‑Gallon Elevated Water Storage Tank Construction

Closes 11/23/2026Opened 10/23/2026

Parkland Health & Hospital System·Texas

69% match

IFB-1984049 - Boiler Refurbishment Services

Rolling / TBD closeOpened 1/1/2017

Chesapeake Bay Bridge and Tunnel District·Virginia

69% match

IFB M-26-004 Replace Vent Building UPS

Closes 11/6/2026Opened 9/18/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

69% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

68% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Eau Claire·Wisconsin

68% match

Cleaning, Repairing, & Painting of Folsom Water Tower

Closes 12/3/2026Opened 10/26/2026