Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›STL District, Franklin County, St. John’s Creek Road…

Missouri Department of Transportation·Missouri

STL District, Franklin County, St. John’s Creek Road Bridge Replacing Low Water Crossing Project

Closes 4/23/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Franklin, Missouri is soliciting sealed bids for the removal of an existing low‑water crossing and construction of a new bridge on St. John’s Creek Road. The scope includes excavation, pile driving, substructure and superstructure work, embankments, asphalt paving, striping, guard rails, traffic control, fencing, and related incidental items. Bidders must be on MoDOT’s Qualified Contractor List, provide a 5 % bid security, meet wage‑rate and immigration‑affidavit requirements, and submit an OSHA ten‑hour safety program within 60 days of commencing work. • Full bridge replacement (excavation, piles, sub‑/superstructure, paving, guard rail) • Required MoDOT Qualified Contractor status and 5 % bid security • Mandatory OSHA safety program submission and immigration compliance affidavit • Electronic bid package distribution; addenda only to Plan‑Holders List • Deadline for questions: April 16, 2026; bid submission deadline: April 23, 2026

Attached files

Contact

Becky Toney

[email protected]

Key dates

Opened
3/13/2026
Questions due
4/16/2026
Closes
4/23/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Project BRO‑R036(002)

Budget estimate

$2,000,000 – $5,000,000

The invitation does not disclose the contract value, but a typical two‑lane rural bridge replacement with associated roadway work in Missouri usually ranges from $2 million to $5 million, depending on bridge length, pile depth, material costs, and site conditions. Assuming a moderate span and standard design, the lower bound would be around $2 M and the upper bound near $5 M. Factors that could shift this range include unexpected geotechnical conditions, design changes, and the inclusion of extensive ancillary work (fencing, guard rails, traffic control).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Missouri Department of Transportation·Missouri

Top match · 75%

SE District, St. Francois County, Silver Springs Road Bridge Replacement

Closes 11/10/2026Opened 10/15/2026

Missouri Department of Transportation·Missouri

73% match

SE District, St, Francois County, King School Road Replacement

Closes 11/10/2026Opened 10/15/2026

Missouri Department of Transportation·Missouri

73% match

STL District, City of St. Louis, Removal and Replacement of Southwest and Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

71% match

STL District, City of Frontenac, Removals, clearing and grubbing, grading, excavation, bridge construction, asphalt pavement, pedestrian decorative fence, etc.

Closes 11/2/2026Opened 9/14/2026

Missouri Department of Transportation·Missouri

70% match

St. Louis District, St. Louis County, Airport Road Multimodal Improvements traffic calming, pavement striping, and installing flexible plastic delineators between North Hanley Road and New Florissant Road

Closes 11/18/2026Opened 10/13/2026

County of Chester·Pennsylvania

70% match

Bridge Rehabilitation for County Bridge #196 and Construction for County Bridge #326

Closes 11/25/2026Opened 10/23/2026

City of Prior Lake·Minnesota

70% match

Lord's Street Bridge Rehabilitation Project

Closes 11/18/2026Opened 10/29/2026

City of St. Louis Board of Public Service·Missouri

70% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Missouri Department of Transportation·Missouri

70% match

NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue

Closes 11/18/2026Opened 10/19/2026

Daviess County·Missouri

69% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Carver County·Minnesota

69% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

Minnesota Department of Administration·Minnesota

69% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Shawnee County·Kansas

69% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Benewah County·Idaho

69% match

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

69% match

PUBLIC NOTICE: 2024–2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) AMENDMENT NO. 6 APPROVED

Rolling / TBD closeOpened 9/22/2026

NYS Niagara County·New York

69% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

County of Chester·Pennsylvania

68% match

Bridge Rehabilitation for County Bridge #190

Closes 11/25/2026Opened 10/22/2026

Missouri Department of Transportation·Missouri

68% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

Texas Department of Transportation·Texas

68% match

STATE LET CONSTRUCTION CONTRACT, BURLESON CO, BRIDGE REPLACEMENT

Closes 11/3/2026Opened 10/7/2026

City of Clearwater·Florida

68% match

Lower Spring Branch Stormwater Improvements

Closes 12/9/2026Opened 9/30/2026

Lewis County·Washington

68% match

Davison Rd MP 0.01 Bridge Rehabilitation

Closes 11/19/2026Opened 10/29/2026

County of Ocean·New Jersey

68% match

Bridge Design Services, Various Locations throughout Ocean County

Closes 11/10/2026Opened 10/22/2026

Hardin County·Kentucky

68% match

Horseshoe Bend Road Bridge Repairs

Closes 11/2/2026Opened 10/22/2026

Minnesota Department of Transportation·Minnesota

68% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Missouri Department of Transportation·Missouri

67% match

Pulaski County, removal of the existing structure and construction of a new 98’-0” single span bridge with prestressed concrete NU-43 girders, etc.

Closes 11/30/2026Opened 10/30/2026