Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of 19.217 miles of Maintenance on Various…

Mississippi

Construction of 19.217 miles of Maintenance on Various Roads in Rankin County, Mississippi

Closes 8/13/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the construction of 19.217 miles of maintenance on various roads in Rankin County, Mississippi. The work includes mobilization, unclassified excavation, granular material, asphalt base repair, asphalt edge repair, asphalt leveling, cold milling of bituminous pavement, ultra-thin asphalt pavement, adjustment of manholes, maintenance of traffic, and installation of construction signs and thermoplastic stripes. The contract will be awarded to the lowest qualified bidder based on published quantities. The project must be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction. Some key features of the project include: • 19.217 miles of maintenance on various roads • Mobilization and unclassified excavation • Granular material and asphalt repair • Cold milling of bituminous pavement and ultra-thin asphalt pavement • Adjustment of manholes and maintenance of traffic • Installation of construction signs and thermoplastic stripes

Attached files

Contact

Lori McIntire

[email protected]

Key dates

Opened
7/23/2026
Closes
8/13/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
46071

Budget estimate

$1,000,000 – $5,000,000

Based on the project's scope and the fact that it involves the construction of 19.217 miles of maintenance on various roads, the estimated budget can be estimated. The total cost of the project is likely to be in the range of $1 million to $5 million, considering the average cost per mile of road construction. However, without more specific information about the project's details and the bidder's qualifications, it is difficult to provide a more accurate estimate. The factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the bidder's experience and qualifications.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Mississippi Jasper County Board of Supervisors·Mississippi

Top match · 74%

Asphalt Paving and Road Improvements Project

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of Transportation·Mississippi

73% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Marshall County Board of Supervisors·Mississippi

73% match

Asphalt Paving Project Barringer Road and Dogwood Road DIP 448 for the Marshall County Board of Supervisors

Closes 11/6/2026Opened 10/8/2026

U.S. Department Of Defense·Mississippi

72% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

Mississippi

72% match

Construction of 0.094 Miles of Box Bridge and Approaches on County Road 16 (SABP‑31(01))

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Mississippi

71% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 9/18/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

Mississippi MS Department of Finance and Administration·Mississippi

71% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

City of Flowood·Mississippi

70% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

Tate County Board of Supervisors·Mississippi

70% match

Tate County Ranger Lake Amenity Improvements

Closes 11/17/2026Opened 10/14/2026

Georgia Twiggs County Board of Commissioners·Georgia

70% match

Twiggs County Patricia Drive Resurfacing

Closes 11/17/2026Opened 10/21/2026

City of Madison·Mississippi

70% match

Roadway Marking 2027

Closes 11/20/2026Opened 10/22/2026

Mississippi Department of Finance and Administration·Mississippi

70% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

Neel-Schaffer, Inc·Mississippi

70% match

NS.CS.222.065 Lowndes County LSBP-44(17) - Old Wolfe Rd.#21218

Closes 11/24/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

Texas Department of Transportation·Texas

70% match

LOCAL LET MAINTENANCE CONTRACT, HARRIS CO, TRAFFIC CONTROL SERVICES

Closes 11/10/2026Opened 10/19/2026

Jackson County Board of County Commissioners·Florida

70% match

ITB 2627-02 - Milling, Resurfacing Old US Road-CR 167 FPID 453534-1-54-01

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026