The US Army Corps of Engineers, New Orleans District, is soliciting bids for the Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 project. The work consists of furnishing one fully crewed and equipped cutterhead dredge, with a dredge discharge size of 30 inches or greater inside diameter (ID), complete in all respects, including all attendant plant, and crew. The project will be performed at the Mississippi River Southwest Pass Area and possibly in other areas of the New Orleans District. The estimated construction cost is between $10,000,000 and $25,000,000.
The key requirements for this project include:
* Furnishing a fully crewed and equipped cutterhead dredge with a dredge discharge size of 30 inches or greater inside diameter (ID)
* Performing maintenance dredging at the Mississippi River Southwest Pass Area and possibly in other areas of the New Orleans District
* Completing the project within 52 days, with the option to extend the contract duration if necessary
* Providing all necessary equipment, labor, and materials to complete the project
* Complying with all applicable laws, regulations, and safety standards.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.