Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Mississippi River, Baton Rouge to the Gulf, Southwest Pass…

U.S. Department Of Defense·Louisiana

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028$10M – $25MInvitation for Bid
Get bids like this by emailBid source

Description

The US Army Corps of Engineers, New Orleans District, is soliciting bids for the Mississippi River Southwest Pass Maintenance Dredging project. The project involves furnishing one fully crewed and equipped cutterhead dredge with a dredge discharge size of 30 inches or greater inside diameter. The work will be performed at the Mississippi River Southwest Pass Area and possibly in other areas of the New Orleans District. The magnitude of construction is estimated to be between $10,000,000 and $25,000,000. • The project requires the contractor to provide a cutterhead dredge and attendant plant, complete and in full operating condition, to commence dredging no later than 15 calendar days after issuance of the Notice to Proceed. • The contractor must meet the equipment requirements and availability requirements as stated in the specifications. • The contractor must provide documentation to prove that the dredge and attendant plant are available and not already obligated for the performance of other work. • The contractor must register in the System for Award Management (SAM) database and use Rapid Vendor Payment. • The contractor must provide sufficient documentation for review and approval that its dredge meets the appropriate production rate for the dredging region.

Attached files

Contact

Cori A. Caimi(Contract Specialist)

[email protected]

(504) 862-1352

Key dates

Opened
4/16/2026
Questions due
5/1/2026
Closes
4/15/2028
Duration
52 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
W912P826BA043

Budget estimate

$10,000,000 – $25,000,000

The budget for this project is estimated to be between $10,000,000 and $25,000,000, as stated in the solicitation document. The actual budget will depend on the bid price and the terms of the contract. Factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the contractor, and the availability of resources and materials.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 99%

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

99% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

99% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

98% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

96% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025

Closes 4/21/2027Opened 4/22/2025

U.S. Department Of Defense·Louisiana

96% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 7-2025 (OM25007)

Closes 3/23/2027Opened 3/25/2025

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 3-2025. Specification No. OM25137

Closes 7/21/2027Opened 5/12/2025

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 8-2026 (OM26008)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 9-2026 (OM26009)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 2-2026 (OM26002)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136

Closes 7/21/2027Opened 5/12/2025

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 3-2026 (OM26003)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 5-2026 (OM26005)

Closes 5/7/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

95% match

Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025

Closes 3/18/2028Opened 3/18/2026