Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›MBE and WBE Subcontractor Procurement for DDC – Degraw…

NYS DDC·New York

MBE and WBE Subcontractor Procurement for DDC – Degraw Firehouse Renovation

Closes 2/12/2026$500k – $5MRequest for QuotationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Lanmark Group is seeking Minority Business Enterprise (MBE) and Women’s Business Enterprise (WBE) Subcontractors for DDC - Degraw Firehouse Renovation, located at 299 Degraw Street, Brooklyn, NY 11231. All work to be performed per the PLA using union wages. The possible trades we are looking to subcontract to M/WBE Subcontractors include: · Demolition · Asbestos Abatement · Concrete · Historic Masonry Cleaning, Restoration and Repointing · Structural Steel Framing, Steel Deck, Metal Framing, Metal Fabrications, Metal Pan Stairs · Rough Carpentry, Sheathing, Engineered Structural Wood, Interior Architectural Woodwork · Waterproofing · Thermal Insulation · Foamed-in-Place Insulation · Asphalt Shingles · Fluid-Applied Roofing · Sheet Metal Flashing and Trim · Applied Fire Protection · Hollow Metal Doors and Frames, Door Hardware · Flush Wood Doors, Stile and Rail Wood Doors, Access Doors and Frames · Metal Sound Control Door Assemblies · Aluminum Framed Entrances and Storefronts · Fire Rated Aluminum Framed Entrances and Storefronts · Wood Windows, Sound Control Windows · Unit Skylights · Glazing, Fire-Rated Glazing · Gypsum Board Assemblies · Ceramic Tiling · Acoustical Panel Ceilings · Wood Flooring · Resilient Tile Flooring, Base and Accessories · Tile Carpeting · Sound-Absorbing Wall and Ceiling Units · Exterior and Interior Painting · Concrete and Masonry Coatings · Panel Signage · Toilet, Bath and Laundry Accessories · Fire Protection Cabinets and Fire Extinguishers · Roller Window Shades · Fire Suppression · Plumbing · HVAC · Electrical/Communications/Electronic Safety and Security · Earth Moving · Vapor Mitigation System · Environmental Management · Excavation Support and Protection · Asphalt Paving, Concrete Paving, Unit Paving · Soil Preparation · Plants · Stainless Steel Wire Trellis · Stormwater Conveyance If you are interested in providing a quote, please contact George Manouselakis at [email protected] or call 347-462-4000. Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 22.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

George Manouselakis(Secretary)

[email protected]

(347) 462-4000

Key dates

Opened
1/28/2026
Closes
2/12/2026
Duration
720 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
236220
Solicitation №
PV957DGRW

Budget estimate

$500,000 – $5,000,000

The budget for this project can be estimated based on the scope of work and the requirements for MBE and WBE subcontractors. Considering the various trades involved, including demolition, asbestos abatement, concrete, and more, the total project cost could be substantial. However, without a specific budget or cost estimate provided in the document, it's challenging to provide an accurate budget estimation. Assuming the project requires a significant amount of labor, materials, and equipment, a rough estimate for the budget could be between $500,000 and $5,000,000. Factors influencing the likely payment range include the complexity of the project, the number of subcontractors involved, and the duration of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS DCAS·New York

Top match · 74%

MBE and WBE Subcontractor Procurement for DCAS – CSB 161 St Elevator Modernization Rebid

Closes 11/18/2026Opened 10/23/2026

North Attleborough Housing Authority·Massachusetts

73% match

Fire Pump Replacement

Closes 11/5/2026Opened 9/30/2026

New York State Office of Parks, Recreation and Historic Preservation·New York

71% match

MBE/WBE/SDVOB Subcontractors & Suppliers Wanted – OPRHP D006731, Harriman State Park

Closes 11/6/2026Opened 10/28/2026

Michigan Northwest Community Schools·Michigan

71% match

NWCS EC Renovations

Closes 11/3/2026Opened 10/16/2026

UCLA Capital Programs·California

71% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 22 - D/B Fire Protection)

Rolling / TBD closeOpened 10/15/2026

City of Lynchburg·Virginia

70% match

LYNCHBURG FIRE STATION 1 RENOVATION

Closes 11/17/2026Opened 10/20/2026

Georgia City of Madison·Georgia

70% match

Request for Proposals New Fire Station Contractor

Closes 11/13/2026Opened 10/8/2026

City of Charlotte·North Carolina

70% match

Firehouse 44

Rolling / TBD closeOpened 1/1/2026

New York State·New York

70% match

NYS MBE/WBE/SDVOB Solicitation: Chiller/Boiler Upgrades Johnson City Center - Mechanical & Plumbing

Closes 11/12/2026Opened 10/26/2026

NYS Parks·New York

70% match

WBE/MBE Opportunity - D006641 Mabey Bridge Panels Replacement

Closes 11/20/2026Opened 10/23/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

70% match

DCP - MITC Building - Occupancy Upgrades DTA, Chelsea, MA

Closes 11/3/2026Opened 9/2/2026

North Carolina Department of Public Safety·North Carolina

69% match

North Carolina Department of Public Safety

Closes 11/17/2026Opened 10/20/2026

Massachusetts Town of Belchertown·Massachusetts

69% match

HVAC Upgrades Belchertown Fire Station

Closes 11/13/2026Opened 10/28/2026

City of Maumelle·Arkansas

69% match

Subcontractor Bid Solicitation – Earthwork, Site Utilities & Site Concrete for New Fire and Police Training Facility

Closes 11/10/2026Opened 10/25/2026

Montgomery County·Virginia

69% match

IFB # 27-07 Montgomery County Fire & EMS Headquarters (due December 10, 2026 3 pm)

Closes 12/10/2026Opened 10/22/2026

General Services, NYS Office of·New York

69% match

47690CHE: Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/28/2026

City of Middletown·Connecticut

69% match

Cross Street Fire Renovations, City of Middletown, CT

Closes 12/15/2026Opened 10/27/2026

Georgia World Congress Center Authority·Georgia

69% match

Fire Protection

Closes 11/11/2026Opened 10/26/2026

Massachusetts Division of Capital Asset Management and Maintenance·Massachusetts

69% match

DCP2604 DCP - MITC Building - Occupancy Upgrades DTA, Chelsea, MA

Closes 11/18/2026Opened 9/2/2026

Miami-Dade County Fire Rescue·Florida

69% match

MDFR Fire Station 35 New Four-Fold Xt Exterior Doors

Closes 11/12/2026Opened 10/16/2026

NYS City of Albany·New York

69% match

DBE/MBE/WBE/SDVOB subcontractors and/or suppliers for the following bid: City of Albany – Transfer Station

Closes 11/17/2026Opened 10/28/2026

Massachusetts Easthampton Housing Authority·Massachusetts

69% match

Easthampton Fire Alarm (FA) Upgrade 667-1, 2 & 3

Closes 11/20/2026Opened 10/28/2026

NYS University District Community Development Association, Inc.·New York

69% match

UDCDA Home Rehabilitation Project

Closes 11/13/2026Opened 10/13/2026

City of Redlands·California

68% match

REBID: Fire Station 263 Bathroom Remodel

Closes 11/10/2026Opened 10/26/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

68% match

SDE1902 Phase 2 Trade RFB

Closes 11/9/2026Opened 10/6/2026