Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›OMH South Beach Psychiatric Center Rehab of Auditorium in…

Dormitory Authority of the State of New York·New York

OMH South Beach Psychiatric Center Rehab of Auditorium in Building 8 and Asbestos Abatement

Closes 10/29/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLYSee the Eligibility Requirements further down in this document.The Dormitory Authority- State of New York (DASNY) is seeking qualified single-prime general contractors to bid on the renovation of the existing auditorium in Building 8 at the South Beach Psychiatric Center Campus, Staten Island.The project consists of renovation of an existing auditorium including demolition, replacement of approximately 420 fixed seats, new carpet and acoustic wall treatments, stage curtain replacement, upgraded stage lighting and rigging systems, complete audiovisual modernization, associated electrical modifications, architectural repairs and refinishing, and environmental abatement coordination.The Estimated Cost for this work is: $2,000,000 to $2,500,000.Project Labor AgreementThe successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.Please find links to the specifications and drawings below:Project ManualDrawingsGeneral Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45%Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6%Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected]. Upon receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received. Instructions for Submission of the EOI Packages:Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.Each package shall be submitted with:A Cover Page that clearly identifies:The Legal Name of the Company submitting the EOIThe Project Name for which the EOI is being submittedThe Date of SubmissionImmediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number.The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation.All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation.Tabs must be in the following sequence: Tab 1 – Company ProfileProvide a company profile that includes the following information:Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project.Date Established – When the company was founded.Company Address – Primary business location.Ownership Information – Name and resumes of all principal owners.Client List – Summary of public and private sector clients.Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers.Equipment - Overview of all equipment owned by the company.Self-Performed Services - Description of all services the company performs directly (not subcontracted).Tab 2 – ExperienceProvide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information:Name of the project designerFirm name and contact informationProject title and location/facilityBrief description of the projectTotal construction costConstruction start dateSubstantial completion dateIndicate role as prime contractor or subcontractorPercentage of the work that was self-performedIf applicable, also include a list of all DASNY projects completed within the last 5 years.Tab 3 – Project SchedulesProvide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.Tab 4 – Safety ProgramProvide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.Tab 5 – RésumésProvide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.Tab 6 – Potential SubcontractorsProvide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.Tab 7 – Anticipated WorkloadProvide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.Tab 8 – Experience Modification RatingProvide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.Tab 9 – Bonding CapacityProvide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.Tab 10 – NYS Vendor Responsibility QuestionnaireProvide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.Eligibility/Qualifications Requirements/Preferences:Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/1/2026
Closes
10/29/2026

Last updated

Details

Industry
Construction
NAICS
236220

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Veterans Affairs·New York

Top match · 67%

F108--620-26-206 Asbestos Abatement

Closes 11/20/2026Opened 10/30/2026

NYS Titan Roofing, Inc.·New York

67% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

Florida Department of Children and Families (DCF)·Florida

67% match

South Florida Evaluation and Treatment Center (SFETC) Operations

Closes 12/4/2026Opened 9/11/2026

California Department of State Hospitals·California

67% match

26-10026-000 BLDG 536, ROOMS 42 & 43 CONVERSION, PROJECT# A24-00043

Closes 12/9/2026Opened 10/29/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

45298 HVAC – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

Ramona Unified School District·California

67% match

Current Bids - BID 262703 OPMS WELLNESS CENTER

Closes 11/16/2026Opened 10/19/2026

UCLA Capital Programs·California

66% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

University of Minnesota·Minnesota

66% match

Bailey Hall Complex Abatement

Closes 11/17/2026Opened 10/20/2026

County of Santa Clara·California

66% match

Behavioral Health Treatment Facility Continuum of Care

Closes 2/23/2028Opened 2/24/2023

Michigan Board of Education of Warren Consolidated Schools·Michigan

66% match

RFP - Asbestos Abatement for BP14

Closes 11/5/2026Opened 10/15/2026

CUNY Baruch College·New York

65% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Veterans Affairs·Oregon

65% match

Z2DA--692-26-201 Refresh Halls and Walls throughout Campus

Closes 11/3/2026Opened 10/16/2026

City of Charleston, WV·Virginia

65% match

2026-41 Demolition of Condemned Church Building

Closes 11/10/2026Opened 10/13/2026

Nassau BOCES·New York

65% match

26/27-055 Abatement & Disposal of Asbestos & Lead Materials

Closes 11/4/2026Opened 10/15/2026

New York City Department of Education·New York

65% match

B3446: Leasing of Multi-Functional Devices

Rolling / TBD closeOpened 9/17/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

45298 CONSTRUCTION – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

Nevada State Public Works Division·Nevada

65% match

Building 8 Exiting Upgrade (Northern Nevada Adult Mental Health Services) (25-M02-12)

Closes 12/1/2026Opened 10/29/2026

Horry County·South Carolina

65% match

Single Family Home Rehabilitation

Closes 11/18/2026Opened 10/28/2026

City of Spartanburg·South Carolina

65% match

Removal of Asbestos Materials & Demolition of Residential Structure(s) Hayne

Closes 11/17/2026Opened 10/21/2026

Illinois DHS - Human Services·Illinois

65% match

DHS IFB CMHC Unit F Flooring Tile Abatement & Refinishing

Closes 11/6/2026Opened 10/14/2026

Miami-Dade County·Florida

65% match

Peace and Prosperity Rehab Program

Closes 11/7/2026Opened 10/22/2026

Oregon South County Health District·Oregon

65% match

Dental Clinic Remodel Project

Closes 11/19/2026Opened 8/31/2026

Florida Department of Juvenile Justice (DJJ)·Florida

65% match

RES-28-Beds-Moderate-Females-IMH-South-C20

Closes 12/7/2026Opened 10/29/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

65% match

Abatement at Cottage 162 & Parkway Garage of Lake Taghkanic State Park

Closes 11/17/2026Opened 10/19/2026

U.S. Department Of Veterans Affairs·Oregon

64% match

Y1DA--REDO CON 653-27-106 Remodel Bathrooms Bldg 1 A Wing Floors 1 and 2

Closes 1/21/2027Opened 10/14/2026