The City of Hartford is seeking a qualified contractor to perform comprehensive repairs and upgrades to the Main & Trumbull (M.A.T.) parking garage. The work includes concrete deck repair, waterproofing, expansion‑joint sealing, corrosion inhibition, drainage system flushing and replacement, striping, painting, selective demolition, and related mechanical installations. The contract also requires compliance with stringent insurance, bonding, prevailing‑wage, MWBE utilization, and local‑resident labor goals. The project schedule targets substantial completion within 420 calendar days (excluding the winter shutdown) and final completion within 450 calendar days.
• Concrete deck removal, repair mortar placement, reinforcement, and curing.
• Installation of a liquid‑applied traffic‑bearing waterproofing membrane and new expansion‑joint systems.
• Drainage system hydro‑jet flushing, new floor drains, and PVC piping; plus striping, painting, and demolition as needed.
• Mandatory 10 % bid bond, 100 % performance/payment bonds (if > $50k), 5 % retainage, $1,000 per day liquidated damages, and $35,000 owner contingency included in the bid.