Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›IFB No. 125629 High Water Bridge Bents Repair, Camp Roberts

California Military Department·California

IFB No. 125629 High Water Bridge Bents Repair, Camp Roberts

Closes 4/15/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The California Military Department is seeking a qualified contractor to repair the high‑water bridge bents at Camp Roberts (San Miguel, CA). The work includes demolition, de‑watering, excavation, foundation underpinning, concrete repair, erosion control, and compliance with multiple federal and state environmental permits. Bidders must hold a valid CSLB Class A General Engineering license (C‑8 concrete license may be waived) and must price a base bid plus up to four optional line items; the total price determines the award. The contract is fixed‑price, with a performance period of 550 calendar days after notice‑to‑proceed, and must be completed by September 30 2031. • Mandatory pre‑bid job walk on 17 Feb 2026 at Camp Roberts. • Full pricing required for all optional line items (0‑4 may be awarded). • Environmental compliance (USACE NWP, Water‑Quality Certification, NMFS Biological Opinion) and extensive monitoring/reporting obligations. • No budget ceiling disclosed; bidders must submit a complete rate sheet and acknowledge all addenda.

Attached files

Contact

Jordan Bernal(Contracting Administrator)

[email protected]

Key dates

Opened
2/9/2026
Questions due
4/1/2026
Pre-bid meeting
2/17/2026Mandatory
Closes
4/15/2026
Duration
550 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB No. 125629

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed, but bridge‑bent rehabilitation projects of this size (≈ 560 ft bridge, multiple bents) typically range from $2 million to $5 million depending on site conditions, environmental mitigation, and optional line items. The estimate assumes moderate material costs, labor, equipment, and the extensive permitting/monitoring requirements outlined in the MMRS.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois THA - Toll Highway Authority·Illinois

Top match · 71%

EMERGENCY NOTICE - Bridge Repairs, I-88, MP 121.9 (Canadian National Railway)

Closes 12/2/2026Opened 9/8/2026

City of High Point·North Carolina

71% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

U.S. Department Of Homeland Security·North Carolina

69% match

REPAIR OF ARM, FIXED HOIST FOR USE ON MH-65

Closes 11/16/2026Opened 9/15/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

69% match

Misc. Steel Repairs - MHB

Closes 11/4/2026Opened 10/20/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Virginia Department of Transportation·Virginia

69% match

B12 CII_2026 SS - HIGH RISE BRIDGE BASCULE REPAIR

Closes 11/18/2026Opened 9/9/2026

Virginia Department of Transportation·Virginia

68% match

IFB 161245 - Sunnybank Ferry Dry Dock; Nthn Neck

Closes 11/4/2026Opened 10/9/2026

Hardin County·Kentucky

68% match

Horseshoe Bend Road Bridge Repairs

Closes 11/2/2026Opened 10/22/2026

NYS Niagara County·New York

67% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

U.S. Department Of Defense·Pennsylvania

67% match

Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Closes 11/23/2026Opened 10/22/2026

City of Ormond Beach - Purchasing Office·Florida

67% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

City of Norfolk·Virginia

67% match

Virginia Beach Blvd Over NS RR Bridge Rehabilitation

Closes 11/16/2026Opened 10/2/2026

City of Hampton·Virginia

67% match

ITB 27-16TM Structural Repairs to 100 Exploration Way-Due Date Extended

Closes 11/10/2026Opened 10/2/2026

City of Charlotte·North Carolina

67% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

Massachusetts Department of Transportation·Massachusetts

67% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 12/1/2026Opened 8/24/2026

Arkansas State Game and Fish Commission·Arkansas

67% match

CR 316 Bridge Reinforcing Project

Closes 11/5/2026Opened 10/4/2026

City of Keene·New Hampshire

67% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

U.S. Department Of Defense·Pennsylvania

67% match

20--PRAIRIE AIR,STBD, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 10/27/2026

New Jersey Turnpike Authority (Njta)·New Jersey

67% match

Contract No. T100.623 Bridge Deck Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2027-2028)

Closes 11/9/2026Opened 10/16/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

67% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

U.S. Department Of Defense·Texas

67% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

U.S. Department Of Defense·North Carolina

67% match

Repair Auto Maintenance Facility Bldg 575 (230040)

Closes 11/23/2026Opened 10/22/2026