Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Harvest Lane and Quast Lane Reconstruction

City of Toledo·Ohio

Harvest Lane and Quast Lane Reconstruction

Closes 10/13/2026$4M – $8MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Toledo is seeking a contractor to fully reconstruct Harvest Lane and Quast Lane. The scope includes removal and replacement of pavement, curbs, drive approaches, storm‑sewer upgrades, and extensive water‑main work (5,500 ft of new 8‑in. water main on Harvest Lane, 410 ft of new 8‑in. water main on Quast Lane, and 890 ft of replacement 6‑/8‑in. water main). Bids must be submitted electronically via the PlanetBids portal, with a 5 % bid guaranty (up to $200,000) and a performance bond of at least the bid amount for contracts over $40,000. Required documentation includes a complete City Paperwork Packet, annual paperwork (EEO, living‑wage affidavit, debarment certification, W‑9), and a construction‑project paperwork packet. Prevailing‑wage and living‑wage requirements apply, and a performance bond of 100 % of the bid is required. The contract is expected to start upon issuance of a purchase order and run through October 15 2027. • Reconstruct pavement, curbs, and drive approaches on two city streets. • Replace storm‑sewer components and install/replace over 6,000 ft of water mains. • Mandatory compliance with City of Toledo’s vendor registration, tax registration, child‑support affidavit, insurance, and labor‑wage statutes. • Electronic bid submission required; bid guaranty 5 % of bid (max $200k) and performance bond 100 % of bid.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
9/18/2026
Questions due
9/30/2026
Closes
10/13/2026
Duration
1 year

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
10008965

Budget estimate

$4,000,000 – $8,000,000

The bid package does not disclose a total contract value, but comparable municipal roadway‑reconstruction projects with extensive water‑main work in Ohio typically range from $4 million to $10 million, depending on site conditions, material costs, and labor rates. Assuming a mid‑size scope (approximately 2 mi of roadway, 6,800 ft of water main, and associated storm‑sewer upgrades), a reasonable estimate would be $4‑$8 million, with potential upside if additional utility upgrades are required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lancaster·Texas

Top match · 65%

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

City of Fort Wayne·Indiana

64% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

City of Fort Wayne·Indiana

64% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Hampton·Virginia

64% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Toledo·Ohio

63% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

Moore & Bruggink, Inc·Michigan

62% match

250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Transportation·Mississippi

62% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Massachusetts Department of Transportation·Massachusetts

62% match

610728 LEE FAP No. NHP(NHS)-003S(967)X Resurfacing and Related Work on Route 20

Closes 11/10/2026Opened 9/14/2026

Texas Jefferson County·Texas

62% match

Garth Road Reconstruction Phase 1

Closes 11/4/2026Opened 10/13/2026

City of Charlotte·North Carolina

62% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

Lake County, CA·California

62% match

South Main Street and Soda Bay Rd Widening and Bike Lanes Project

Closes 11/30/2026Opened 10/31/2026

Nevada Government·Nevada

62% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Massachusetts Town of Barre·Massachusetts

62% match

FY27-06 Cutler Road Reconstruction

Closes 11/5/2026Opened 10/22/2026

City of Corning·California

62% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

City of Toledo·Ohio

62% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Highland Village·Texas

62% match

Highland Shores Boulevard Reconstruction Project

Closes 11/12/2026Opened 9/26/2026

California Department of Transportation·California

62% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

City of Shawnee·Kansas

62% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025