Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›US Route 1 Corridor - Installation of Adaptive Signal…

Connecticut Town of Greenwich·Connecticut

US Route 1 Corridor - Installation of Adaptive Signal Control Technology (ASCT)

Closes 3/11/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Greenwich is seeking a qualified contractor to construct modifications at twenty-nine signalized intersections along Route 1 in Greenwich. The project includes the implementation of traffic signal modifications, including Adaptive Signal Control Technology, signal heads, pedestrian signals, signal controllers, cabinets, and system integration, plus the construction of ADA-compliant curb ramps to improve traffic operations and increase pedestrian accessibility. Some key points to consider: • The project involves the installation of Adaptive Signal Control Technology (ASCT) at twenty-nine signalized intersections. • The project includes the construction of ADA-compliant curb ramps to improve pedestrian accessibility. • The contractor will be responsible for implementing traffic signal modifications, including signal heads, pedestrian signals, signal controllers, and cabinets. • The project requires system integration to ensure the smooth operation of the traffic signals and other components. • The contractor must ensure that the project is completed in accordance with the town's requirements and regulations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Kiselak

[email protected]

(203) 622-3839

Key dates

Opened
2/11/2026
Closes
3/11/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990
Solicitation №
Town Project 20-26

Budget estimate

$5,000,000 – $15,000,000

The budget for this project is not explicitly stated, but based on the scope of the project, which includes the installation of Adaptive Signal Control Technology at twenty-nine signalized intersections, the construction of ADA-compliant curb ramps, and system integration, the estimated budget could be in the range of $5 million to $15 million. This estimate is influenced by the complexity of the project, the number of intersections involved, and the need for specialized equipment and labor. However, without more detailed information about the project's requirements and the contractor's costs, this estimate is highly speculative.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bakersfield·California

Top match · 70%

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

City of Clovis·California

70% match

Adaptive Signalization

Closes 11/17/2026Opened 10/22/2026

City of Charlotte·North Carolina

67% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

City of Charlotte·North Carolina

66% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

66% match

Mt Holly-Huntersville Road Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Texas Department of Transportation·Texas

66% match

Traffic Signal Cable

Closes 11/9/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

65% match

B11_2027 SMART SCALE CORRIDOR IMPROVEMENTS

Closes 11/18/2026Opened 10/27/2026

California Department of Transportation·California

65% match

Modify the existing traffic control signals.

Closes 11/17/2026Opened 10/26/2026

Texas Montgomery County·Texas

65% match

Traffic Signal Detection Upgrades (CSJ: 0912-37-267)

Closes 11/12/2026Opened 10/21/2026

Texas Department of Transportation·Texas

64% match

Traffic Control Services, Statewide

Closes 11/20/2026Opened 10/21/2026

Massachusetts Department of Transportation·Massachusetts

64% match

616482 DISTRICT 4 Deployment of Temporary Traffic Control at Various Locations

Closes 11/17/2026Opened 10/26/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

64% match

MFSE ATC Replacment Project Update

Rolling / TBD closeOpened 4/11/2026

County of Los Angeles Department of Public Works·California

63% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

California Department of Transportation·California

63% match

Install lighting, striping, and signage upgrades.

Closes 11/19/2026Opened 10/19/2026

City of Charlotte·North Carolina

63% match

Traffic Signal Installation and Maintenance

Rolling / TBD closeOpened 12/31/2026

City of Rock Hill·South Carolina

63% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of Fort Smith·Arkansas

63% match

TRAFFIC SIGNAL IMPROVEMENTS 25-09-A

Closes 11/10/2026Opened 10/21/2026

South Carolina Materials Mgmt Ofc·South Carolina

63% match

STC TRAFFIC CONTROL DEVICES

Closes 9/16/2027Opened 7/17/2023

City of Fort Smith·Arkansas

63% match

Traffic Signal Improvements Phase A – 2024 Capital Improvements Program

Closes 11/10/2026Opened 10/25/2026

Connecticut Office of DOT - Rail·Connecticut

63% match

Project 0301-0154 NHL Signal Equipment Request for Proposals

Closes 11/5/2026Opened 8/12/2026

NYS Monroe County·New York

63% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Bremerton·Washington

62% match

SR 303 Adaptive Signals (Sheridan Rd to NE Riddell Rd)

Closes 11/20/2026Opened 10/29/2026

State of Delaware DOT·Delaware

62% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Los Angeles County Public Works·California

62% match

TDS0001709 San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

U.S. 69A350 OSDBU·United States of America

62% match

Small Business Transportation Technical Assistance Center (Region 1)

Closes 10/31/2026Opened 10/1/2026