Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›ITB 2026-07 Dr. MLK Jr. Memorial Road Multipurpose Path…

Wakulla County·Florida

ITB 2026-07 Dr. MLK Jr. Memorial Road Multipurpose Path Construction

Closes 5/15/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a qualified contractor to construct an approximately 1.115‑mile, 8‑ft wide multipurpose path along Dr. Martin Luther King Jr. Memorial Road in Wakulla County, Florida. The work includes earthwork, asphalt paving, concrete structures, drainage, utility coordination, signage, and final landscaping. The contract will be a firm‑fixed‑price, construction award with a 180‑day substantial‑completion schedule and strict bonding, insurance, and FDOT qualification requirements. • Length ≈ 1.115 mi (≈ 5,890 ft) with 8‑ft width, serving pedestrians and cyclists. • Scope covers cut‑and‑fill, asphalt pavement, concrete curb‑and‑gutter, box culverts, drainage structures, signage, crosswalk markings, and performance‑turf installation. • Contractor must hold a valid Florida contractor’s license, meet FDOT work‑class qualifications (11, 28, 40), provide 5 % bid bond (if > $250 k), 100 % performance and payment bonds, and carry required insurance. • Mandatory pre‑bid conference/site visit on April 28, 2026; bids due May 15, 2026. All bids were later rejected, and the project will be rebid at a future date.

Attached files

Contact

Berkleigh Nowak(Procurement & Contracts Coordinator)

[email protected]

(850) 745-7715

Key dates

Opened
4/16/2026
Questions due
4/30/2026
Pre-bid meeting
4/28/2026Mandatory
Site visit
4/28/2026Mandatory
Closes
5/15/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
ITB 2026-07

Budget estimate

$2,000,000 – $5,000,000

Based on typical Florida county road projects of similar length (≈ 1.1 mi) and the extensive scope (earthwork, asphalt, drainage, concrete structures, signage, and turf), a realistic contract value would likely fall between $2 million and $5 million. The lower end assumes modest site conditions and minimal utility relocations; the higher end accounts for heavier earthwork, extensive drainage, and higher material costs. Therefore, the client can expect a budget in the low‑to‑mid‑single‑digit million‑dollar range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Iowa City·Iowa

Top match · 72%

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Hampton·Virginia

71% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Harrisonburg·Virginia

71% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

St. Martin Parish Government·Louisiana

70% match

2026 ROAD IMPROVEMENTS PROJECT

Closes 12/2/2026Opened 10/21/2026

Virginia Department of Transportation·Virginia

70% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

70% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Cobb County·Georgia

70% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

NYS East Fishkill, Town of·New York

70% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Cincinnati·Ohio

70% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

NYS Cambria, Town of·New York

70% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Georgia Harris County Commissioners·Georgia

70% match

Construction of the Man O'War Trail Phase VII

Closes 11/10/2026Opened 10/1/2026

Missouri Department of Transportation·Missouri

70% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Massachusetts Town of Nantucket·Massachusetts

70% match

IFB - Tom Nevers Road Multi-Use Path Project

Closes 11/17/2026Opened 10/14/2026

City of Lancaster·Texas

70% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

City of Charlotte·North Carolina

70% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Maryville·Missouri

70% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

City of Brandon·Mississippi

69% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

Georgia Liberty County Board of Commissioners·Georgia

69% match

MAIN TRAIL ROAD IMPROVEMENTS

Closes 11/17/2026Opened 10/14/2026

Georgia Cobb County Department of Transportation·Georgia

69% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Flowood·Mississippi

69% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

Maryland Howard County Government·Maryland

69% match

IFB-2027-19 PATUXENT BRANCH TRAIL IMPROVEMENTS

Closes 12/23/2026Opened 10/24/2026

City of Charlotte·North Carolina

69% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

69% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Virginia Department of Transportation·Virginia

69% match

A53_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/27/2026

Georgia Wilcox County Board of Commissioners·Georgia

69% match

2026 TIA Road Resurfacing Improvements - Pleasant View Road

Closes 11/5/2026Opened 10/7/2026