Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›751/24273.DPL; Deadhorse Dam Removal

Michigan Department of Technology, Management, and Budget, and Michigan Department of Natural Resources·Michigan

751/24273.DPL; Deadhorse Dam Removal

Closes 6/3/2026$500k – $2MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Deadhorse Dam Removal project involves the removal of an existing dam and the restoration of a wetland area in Missaukee County, Michigan. The project includes the removal of the existing embankment, control structure, and outlet pipe, as well as the construction of a new channel and the protection of the channel with fieldstone. The project also involves the disposal of spoils in an approved on-site upland location. The contractor will be responsible for maintaining access for mail delivery and garbage pickup, coordinating drive closures and mail box relocations with landowners, and restoring incidental damages on the project as directed by the owner and engineer. The project requires the contractor to provide dust control and sweep roads daily, and to restore all lawn areas per specifications and plans. Some key aspects of the project include: • Removing the existing dam and restoring the wetland area • Constructing a new channel and protecting it with fieldstone • Disposing of spoils in an approved on-site upland location • Maintaining access for mail delivery and garbage pickup • Coordinating drive closures and mail box relocations with landowners • Restoring incidental damages on the project as directed by the owner and engineer • Providing dust control and sweeping roads daily • Restoring all lawn areas per specifications and plans The project requires the contractor to comply with various regulations and standards, including the Michigan Department of Environment, Great Lakes, and Energy (EGLE) regulations and the Federal Highway Administration (FHWA) guidelines. The contractor must also ensure that all work is done in accordance with the approved plans and specifications, and that all necessary permits and approvals are obtained before commencing work.

Attached files

Contact

Kristi Zakrzewski(Buyer)

[email protected]

(517) 243-5669

Key dates

Opened
5/29/2026
Closes
6/3/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237990
Solicitation №
RFQ-171-260000000299-2

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the type of services required. The project involves dam removal, wetland restoration, and channel construction, which are complex and labor-intensive tasks. The cost of the project will depend on various factors, including the size of the dam, the extent of the wetland restoration, and the materials and equipment required for the construction of the new channel. Based on industry standards and benchmarks, the estimated budget for this project could be in the range of $500,000 to $2 million, depending on the specific requirements and complexities of the project. The factors that may influence the likely payment range include: 1. The size and complexity of the dam removal 2. The extent of the wetland restoration 3. The materials and equipment required for the construction of the new channel 4. The labor costs and requirements for the project 5. The environmental and regulatory requirements that must be met Overall, the estimated budget for this project is likely to be in the range of $500,000 to $2 million, although the actual cost may vary depending on the specific circumstances of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Top match · 72%

DGS 142‑8, PH 1 – Dam Removal – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Commonwealth of Kentucky·Kentucky

68% match

RFB-105-27 Big Bone Lake Dam Decommissioning

Closes 12/2/2026Opened 10/27/2026

NYS Niagara County·New York

67% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

67% match

Demolition of Cedar Lake Horse Barns

Closes 11/10/2026Opened 10/6/2026

City of Plano·Texas

67% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

City of Plano·Texas

66% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

Town of Dumfries·Virginia

66% match

IFB # 27-003 - UTILITY ABANDONMENT AND SITE RESTORATION AT 3800 GRAHAM PARK ROAD

Closes 11/5/2026Opened 10/15/2026

Georgia Gwinnett County·Georgia

66% match

BL148-26, Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Gwinnett County Government·Georgia

66% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Kentucky

65% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Snohomish County PUD·Washington

65% match

PWC - Lake Stevens Circuit 12-124; Transmission and Distribution Line Clearance

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

65% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 3-2026, OM26061

Closes 6/12/2028Opened 6/14/2026

U.S. Department Of Defense·Oklahoma

65% match

Powerline Tree Clearing and Dead Tree Felling Services

Closes 11/20/2026Opened 10/30/2026

Roanoke City Government·Virginia

65% match

SOL1342, Wiley Drive Low Water Bridge Replacement

Closes 11/4/2026Opened 9/23/2026

DuPage County - Procurement Services·Illinois

65% match

TREE REMOVAL 26-096-SWM

Closes 11/10/2026Opened 10/22/2026

U.S. Department Of Defense·Louisiana

65% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 2-2026, OM26060

Closes 4/7/2027Opened 3/23/2026

California Highway Patrol·California

65% match

Water Conservation Landscape Services - IFB 26C330002

Closes 11/6/2026Opened 9/9/2026

North Carolina City of Raleigh·North Carolina

65% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

The City of Columbus·Ohio

65% match

RFQ033860 - Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

City of Creve Coeur·Missouri

65% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Lake County·California

65% match

Abatement of Dilapidated Lakebed Structures #01

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of The Interior·Wyoming

65% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

Georgia Fayette County Board of Commissioners (Purchasing Department)·Georgia

65% match

27043-B: Lake McIntosh Dam Structural Repairs

Closes 11/19/2026Opened 10/13/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024