The project involves HMA full depth road patches in Springbrook campground, as described and specified in the project plans. The contractor shall verify actual locations and elevations with the DNR Engineer and visit the site to inspect the project area prior to bidding and the start of work. The project requires the contractor to provide waste areas or disposal sites for excess material and to maintain surface drainage. The contractor is also expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project.
• The project is located in Guthrie County, Iowa.
• The project involves HMA full depth road patches in Springbrook campground.
• The contractor shall verify actual locations and elevations with the DNR Engineer.
• The contractor shall visit the site to inspect the project area prior to bidding and the start of work.
• The project requires the contractor to provide waste areas or disposal sites for excess material.
• The project requires the contractor to maintain surface drainage.
• The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.