The U.S. Army Corps of Engineers is conducting market research to facilitate a determination of acquisition strategy for the Yap Hospital Mold Mitigation project. The project involves mitigating existing mold contamination and preventing future mold growth by restoring the heating, ventilation, and air conditioning (HVAC) system for the Yap Memorial Hospital. The work includes design, construction, and testing and balancing of the HVAC system, as well as removal and replacement of mold-contaminated materials. The project must comply with all federal, state, and local codes and laws. Key features of the work include:
• Design and installation of a new chiller plant control system
• Replacement of air handling units and coils
• Installation of new heating hot water system
• Testing and balancing of the HVAC system
• Post-construction contamination verification
The contractor will be required to provide a site survey report, a renewal report, and a work plan, and to conduct a pre-site survey teleconference and a pre-construction conference. The contractor will also be required to provide monthly progress reports and to attend review conferences as required.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.