The City of Atlanta is seeking a qualified consultant to design a paved shared use path connecting the Southside Beltline Trail to the Southtowne Trail at South Bend Park. The project will be delivered in two phases, with this RFP covering Phase I. The consultant will be responsible for preparing concept, preliminary, and final design plans, as well as conducting environmental screenings and NEPA documentation. The project requires experience in designing off-system paved shared use trails, particularly within Atlanta and the state of Georgia. Key considerations include designing to available project budget, accounting for public and stakeholder feedback, and producing plans that are easily understood by contractors.
• The project involves designing a paved shared use path for Phase I, which will extend from the Southside Trail to Pryor Road at Meldon Avenue.
• The consultant will prepare concept, preliminary, and final design plans in accordance with GDOT's Design Policy Manual and other relevant design standards.
• The project requires environmental screenings and NEPA documentation, including identifying environmental resources adjacent to the project and preparing necessary NEPA documents.
• The consultant will collaborate with the PATH foundation and ATLDOT communications team to develop a strategy for public and stakeholder engagement.
• The project has a base period of 18 months with two one-year renewal options.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.