Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Tate County, Mississippi, Mississippi Delta Headwaters…

U.S. Department Of Defense·Mississippi

Tate County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 17-01

Closes 2/4/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers, Vicksburg District, is soliciting bids for the construction of four grade control structures in Tate County, Mississippi, as part of the Mississippi Delta Headwaters Project, Bank Stabilization 17-01. The project involves mobilization and demobilization, clearing and grubbing, excavation, backfill, embankment, stone placement, storm water pollution prevention, and environmental protection. The estimated completion time is 105 calendar days after the contractor receives the Notice to Proceed. • The project will be competed under Federal Acquisition Regulation (FAR) Part 14, Sealed Bidding, and will result in the award of one Firm Fixed-Price (FFP) Construction contract. • The set-aside for this procurement is Women-Owned Small Business (WOSB). • The North American Industry Classification System (NAICS) Code is 237990, Other Heavy and Civil Engineering Construction. • The magnitude of this construction project is estimated to be between $1,000,000.00 and $5,000,000.00.

Attached files

Contact

Freteshia L. Johnson(Primary Contact)

[email protected]

(601) 631-5219

Key dates

Opened
12/16/2025
Closes
2/4/2026
Duration
105 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912EE26BA001

Budget estimate

$1,000,000 – $5,000,000

The budget for this opportunity is estimated to be between $1,000,000.00 and $5,000,000.00, as specified in the document. This estimate is based on the magnitude of the construction project. The actual budget may vary depending on the bids received and the final contract award. Factors that may influence the likely payment range include the complexity of the project, the number of bidders, and the availability of funds.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Mississippi

Top match · 79%

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

U.S. Department Of Defense·Mississippi

73% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 9/18/2026

Tate County Board of Supervisors·Mississippi

70% match

Tate County Ranger Lake Amenity Improvements

Closes 11/17/2026Opened 10/14/2026

St. Louis County, MN - Purchasing Division·Minnesota

69% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

Washakie County Conservation District·Wyoming

67% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

California Grants·California

67% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

Mississippi MS Department of Finance and Administration·Mississippi

67% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

Lauderdale County Board of Supervisors·Mississippi

66% match

RFP NO. LC022-2026:PURCHASE & DEVELOPMENT OF LAUDERDALE COUNTY PROPERTY

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

Neel-Schaffer, Inc·Mississippi

66% match

NS.CS.222.065 Lowndes County LSBP-44(17) - Old Wolfe Rd.#21218

Closes 11/24/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

Mississippi

66% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Transportation·Mississippi

65% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Mississippi

65% match

Construction of 0.094 Miles of Box Bridge and Approaches on County Road 16 (SABP‑31(01))

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of The Interior·Colorado

65% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

Mississippi Department of Health·Mississippi

65% match

Mississippi State Loan Repayment Program (SLRP): Sponsoring Entity (Practice Site)

Closes 5/31/2029Opened 7/31/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

65% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

Greenville County·South Carolina

65% match

Huff Creek Watershed Reservoir Maintenance

Closes 11/20/2026Opened 10/30/2026

Mississippi Jasper County Board of Supervisors·Mississippi

65% match

Asphalt Paving and Road Improvements Project

Closes 11/2/2026Opened 10/30/2026