Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Construction
  5. ›REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW…

Town of Waterford·Connecticut

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)

Closes 11/12/2026$180k – $260kRequest for Tender
Get bids like this by emailBid source

Description

The Town of Waterford is soliciting sealed bids from qualified, licensed contractors to replace existing plastic water distribution lines with new copper water services along Rope Ferry Road (State Road) as part of its FY27 capital improvement program. The scope includes removal of existing plastic pipe, installation of new copper pipe (1‑in. and 2‑in. sizes), associated fittings (main taps, corporation stops, curb stops, curb boxes), trenching, back‑filling, pavement repair, and coordination with multiple utility owners. The contract will be awarded to the lowest responsible bidder, with a mandatory 90‑day completion window after the Notice to Proceed and liquidated damages of $1,000 per day for overruns. Bidders must provide a 10 % bid bond (if bid > $50 k), performance and payment bonds (if contract > $50 k/$100 k respectively), and comply with prevailing‑wage, CHRO, and insurance requirements. • Project location: Rope Ferry Road, Waterford, CT • Estimated contract value: likely > $50 k (bond requirements) but < $1 M (prevailing‑wage exemption threshold) • Timeline: Bid submission by 2:00 pm on 12 Nov 2026; award shortly thereafter; work must start within 30 days of award and finish within 90 days. • Key requirements: Licensed Connecticut contractor, surety bonds, 5 % retainage plus additional retainage, compliance with state labor and minority‑business set‑asides, underground utility coordination, “call‑before‑you‑dig” notification.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jill Stevens

[email protected]

(860) 444-5886

Key dates

Opened
10/16/2026
Questions due
10/26/2026
Closes
11/12/2026
Duration
90 days

Last updated

Details

Type
Request for Tender
Industry
Construction
NAICS
237110
Solicitation №
IFB# 26-014

Budget estimate

$180,000 – $260,000

The bid is for a full water‑main replacement on a municipal road. Similar small‑to‑medium water‑main projects in Connecticut typically range from $150,000 to $300,000, depending on linear footage, depth of trench, traffic control, and pavement restoration. The requirement for copper pipe (more expensive than plastic) and the inclusion of performance/payment bonds push the estimate toward the higher end of that band. Therefore, a reasonable expected contract value is roughly $180,000 – $260,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of Waterford·Connecticut

Top match · 96%

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

Town of Waterford·Connecticut

86% match

Cross Country Sewer Easement Access Contract One -Phase 2

Closes 11/12/2026Opened 10/16/2026

Town of Bennington·Vermont

84% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Town of Clinton·Connecticut

83% match

Replacement of Bridge No. 06956, Country Village Lane

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

83% match

Severn/Tyndal Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/17/2026

Connecticut Town Of Clinton·Connecticut

82% match

Replacement of Bridge No. 06956, Country Village Lane over Unnamed Brook

Closes 11/4/2026Opened 10/9/2026

City of Austin·Texas

82% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

City of Grand Forks, North Dakota·North Dakota

82% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

Connecticut Cromwell Fire District·Connecticut

82% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

North Carolina Orange Water and Sewer Authority·North Carolina

82% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

City of Meriden·Connecticut

82% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Ontario·California

82% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Rockford·Illinois

82% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Massachusetts Town of Plymouth·Massachusetts

82% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

City of Shawnee·Kansas

82% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Cecil County·Maryland

82% match

Repair Port Deposit I&I - Package 3

Closes 12/10/2026Opened 10/28/2026

Maryland Frederick County Government·Maryland

82% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

City of Riverside·California

82% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Cincinnati·Ohio

82% match

Plumbers For Replacement of Lead Service Lines

Closes 6/18/2027Opened 7/28/2026

North Carolina Orange Water and Sewer Authority·North Carolina

82% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/26/2026

Maryland Baltimore City Department of Public Works·Maryland

82% match

W.C. 1464-Lead Pipe Inspection and Replacement

Closes 11/18/2026Opened 10/7/2026

City of Rockford·Illinois

82% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

County of Frederick, MD·Maryland

81% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026

Town of Manchester·Connecticut

81% match

FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY

Closes 11/17/2026Opened 10/20/2026

Bristol Virginia Utilities Authority·Virginia

81% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026