Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›West Main/Elliots Crossing Water, Sewer, Storm Drainage…

Georgia City of Thomaston·Georgia

West Main/Elliots Crossing Water, Sewer, Storm Drainage and Street Improvements

Closes 5/29/2026$4.8M – $19MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Thomaston is seeking bids for the West Main/Elliots Crossing Water, Sewer, Storm Drainage and Street Improvements project. The work includes the installation of water system improvements, sanitary sewer system improvements, storm water system improvements, and road improvements. The project requires the installation of approximately 3,700 LF of 8” CL350 DIP water main, 3,572 LF of 8” gravity main, and various other equipment and materials. The project also includes the installation of a stormwater pond, catch basins, and junction boxes. The contractor must be licensed by the State of Georgia and comply with applicable state and federal bid laws. • The project is funded by RWHI funds through the Department of Community Affairs. • The project requires compliance with the Build America, Buy America Act (BABAA) requirements. • The City is committed to providing equal access to its services, programs, activities, education, and employment. • The project includes mobilization and demobilization, traffic control, erosion control, pressure testing, and stump removal. • The contractor must provide a bid bond or certified cashier’s check in an amount not less than 5% of the base bid. • The contractor must provide performance and payment bonds, each in an amount equal to 100% of the contract price, if the contract is awarded.

Attached files

Contact

Reshann Adams(Buyer Contact)

[email protected]

(706) 647-6633

Key dates

Opened
4/8/2026
Closes
5/29/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
PE-74521-NONST-2026-000000020

Budget estimate

$4,750,000 – $19,000,000

The budget for this project can be estimated based on the scope of work and the requirements for the bid bond and performance bond. The bid bond requires a minimum of 5% of the base bid, and the performance bond requires 100% of the contract price. Assuming a moderate-sized construction project, the total contract price could be in the range of $5 million to $20 million. Therefore, the budget for the contractor could be in the range of $4.75 million to $19 million, assuming a 5% profit margin. However, this is a rough estimate and the actual budget could be higher or lower, depending on the specifics of the project and the contractor's costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Lebanon·Indiana

Top match · 75%

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Ketchikan·Alaska

73% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

City of Grand Rapids Department of Engineering·Michigan

73% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

City of Fargo·North Dakota

72% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Frostproof·Florida

72% match

Septic to Sewer - W 9th St

Closes 12/8/2026Opened 10/26/2026

City of Ontario·California

72% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Charlotte·North Carolina

71% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Town of South Hill·Virginia

71% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

Clermont County - Board of Commissioners·Ohio

71% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Seattle·Washington

71% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Charlotte·North Carolina

71% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Philadelphia·Pennsylvania

70% match

PW Bid 2917 - SEWER RECONSTRUCTION and RELAY of WATER MAINS in BROOKLYN ST from ASPEN ST

Closes 11/5/2026Opened 10/14/2026

City of Douglas·Wyoming

70% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Idaho Transportation Department·Idaho

70% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

City of Frostproof·Florida

70% match

Septic to Sewer - Wood and Palmetto Ave

Closes 12/8/2026Opened 10/26/2026

Massachusetts Town of Westborough·Massachusetts

70% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Charlotte·North Carolina

70% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

Hastings Utilities·Nebraska

70% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Valdosta·Georgia

70% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026