Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Hampshire
  4. ›Civil Engineering
  5. ›Downtown Infrastructure Project

City of Keene·New Hampshire

Downtown Infrastructure Project

Closes 12/18/2025$10M – $20MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Keene is seeking qualified bidders for the Downtown Infrastructure Improvements and Reconstruction Project. The project includes drain system improvements, water system improvements, sewer system improvements, raised stamped concrete intersections, and landscaping. The project will be completed in two phases over the 2026 and 2027 construction seasons. The bid documents include a detailed description of the project, including technical specifications and requirements. • Drain system improvements: removal and replacement of existing pipe, catch basins, drop inlets, and manholes • Water system improvements: removal, replacement, and installation of water main, gate valves, hydrants, and water services • Sewer system improvements: removal and replacement of existing sewer pipe and manholes • Raised stamped concrete intersections and rapid flashing pedestrian beacons • Landscaping: trees, shrubs, perennial plantings, loam, seed, and mulch • Traffic signal removal and replacement • Signage removal and replacement • Removal and disposal of existing storm drain and stormwater structures • Associated maintenance of traffic, erosion controls, SWPPP management, road and sidewalk reconstruction, and pavement markings

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Yves P Gakunde(Purchasing Agent)

[email protected]

(603) 357-9800 ext 6097

Key dates

Opened
11/6/2025
Pre-bid meeting
11/18/2025
Closes
12/18/2025
Duration
810 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
01-26-05

Budget estimate

$10,000,000 – $20,000,000

Based on the scope of work and the estimated quantities of materials and labor, the total project cost is likely to be in the range of $10 million to $20 million. This estimate is rough and may vary depending on various factors such as the bidder's experience, equipment, and labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Milton·Vermont

Top match · 68%

Downtown Core Mixed-Use Development

Closes 11/9/2026Opened 9/15/2026

City of Rock Hill·South Carolina

67% match

Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of Rock Hill·South Carolina

66% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of DeLand·Florida

65% match

DOWNTOWN RELIEF LIFT STATION

Closes 11/10/2026Opened 10/9/2026

City of Edmond·Oklahoma

65% match

Downtown Edmond Master Plan

Closes 2/1/2027Opened 10/23/2026

City of Lowell·Arkansas

65% match

RFQ: Lowell Downtown Master Plan

Closes 11/20/2026Opened 10/25/2026

City of DeLand·Florida

65% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

City of Mulvane·Kansas

65% match

Mulvane - Downtown ADA Improvements

Closes 11/18/2026Opened 10/22/2026

City of Charlotte·North Carolina

64% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Fargo·North Dakota

64% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Charlotte·North Carolina

64% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Washington Spokane Transit Authority·Washington

64% match

DOWNTOWN CHARGING & LAYOVER FACILITY DESIGN & ENGINEERING SERVICES

Closes 11/17/2026Opened 10/19/2026

City of Charlotte·North Carolina

64% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Tampa-Hillsborough County Expressway Authority·Florida

64% match

Downtown Viaduct Feasibility Analysis

Closes 12/15/2026Opened 10/21/2026

City of Cleveland·Ohio

64% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

City of Lowell·Arkansas

64% match

RFQ: Lowell Downtown Master Plan

Closes 11/20/2026Opened 10/18/2026

Minnesota Department of Transportation·Minnesota

63% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Town of Vinton·Virginia

63% match

Downtown Mixed Use Development Opportunity

Closes 11/20/2026Opened 10/8/2026

City of Charlotte·North Carolina

63% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

City of Thousand Oaks·California

63% match

Thousand Oaks Downtown Project Master Developer

Closes 11/18/2026Opened 8/21/2026

Delaware Valley Regional Planning Commission·Pennsylvania

63% match

Transportation Facilities Master Plan (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/2/2026Opened 10/19/2026

Goodwyn Mills Cawood·Alabama

63% match

Wayfinding Signage Downtown Montgomery PROJECT NO. SP-5-26

Closes 11/17/2026Opened 10/7/2026

City of Coronado·California

63% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Charlotte·North Carolina

63% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Indianapolis·Indiana

63% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/31/2026