Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›Gymnasium Cooling Project

Michigan Pellston Public Schools·Michigan

Gymnasium Cooling Project

Closes 6/30/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pellston Public Schools are seeking a qualified Mechanical/Structural Engineer/HVAC contractor to design, provide, and install new air conditioning to the High School Gymnasium. The project includes adding roof-top units and reinforcing the existing structure to support the new units. The contractor will be responsible for providing a complete working system, including roof curbs, ductwork, startup, and controls. * Key aspects of the project include: * Designing adequate roof-top units to supply conditioned air throughout the gymnasium * Designing ductwork to achieve comfortably supplied air conditioning * Installing structural supports to support the newly added weights on the existing roof structure * Providing lifting for proper RTU setting * Providing power to new units according to current Michigan Electrical Codes * Installing and providing start-up for new AC units * Installing supply and return air ductwork * Installing new thermostats and control wire as required * Coordinating control operation with the existing heating system * Providing training to district staff on proper operation of the new system * Repairing roofing/flashing for the installation and obtaining a warranty from the roofing manufacturer after project completion

Attached files

Contact

Stephen Seelye(Superintendent)

[email protected]

(231) 539-8421

Key dates

Opened
6/11/2026
Pre-bid meeting
6/23/2026Mandatory
Closes
6/30/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238220
Solicitation №
RFP-PELL-260000002206-1

Budget estimate

$200,000 – $500,000

The estimated budget for this project can be determined by considering the scope of work, which includes designing and installing new air conditioning for the High School Gymnasium. The cost of such a project can vary widely depending on factors such as the size of the gymnasium, the type and number of roof-top units required, and the extent of structural reinforcements needed. However, as a rough estimate, the cost of a similar project could range from $200,000 to $500,000, considering the costs of materials, labor, and equipment. Factors that may influence the likely payment range include: * The complexity of the design and installation * The cost of materials and equipment * The labor costs and the number of workers required * The need for additional structural reinforcements or repairs * The cost of obtaining necessary permits and inspections Given these factors, a reasonable estimate for the budget could be between $200,000 and $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia Gainesville City School System·Georgia

Top match · 71%

Design Build Project - Centennial Arts Academy Improvements (Gym & Roof)

Closes 12/1/2026Opened 10/26/2026

Harmony Public Schools·Texas

69% match

Harmony Science Academy Irving- Gym/Storm Shelter

Closes 11/5/2026Opened 10/14/2026

Harmony Public Schools·Texas

69% match

Harmony Science Academy Irving- Gym/Storm Shelter

Closes 11/5/2026Opened 10/14/2026

Town of Arlington·Massachusetts

68% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

Winooski School District·Vermont

67% match

Gym Flooring and Upgrades

Closes 11/30/2026Opened 10/22/2026

Brazos Valley·Texas

67% match

Lincoln Center Gym Floor Removal and Installation

Closes 11/13/2026Opened 10/26/2026

Georgia Wayne County Board of Education·Georgia

67% match

Construction of: New Athletic Facilities and New Board of Education Central Office

Closes 11/12/2026Opened 10/15/2026

Stockton Unified School District·California

66% match

RFQ/P #26-27-12 Franklin High School Building "A" HVAC Project

Closes 11/19/2026Opened 10/28/2026

Bridgewater-Raritan Regional School District·New Jersey

66% match

B26.108 HS GYM HVAC RE BID

Closes 11/10/2026Opened 10/15/2026

Harmony Public Schools·Texas

66% match

Harmony Science Academy Irving- Gym/Storm Shelter

Closes 11/5/2026Opened 10/14/2026

San Gabriel Unified School District·California

66% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

University of South Carolina·South Carolina

66% match

Repair and Refinish Gym Floors

Closes 12/2/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Michigan Northview Public Schools·Michigan

65% match

Northview High School Gymnasium Roof Replacement

Closes 11/2/2026Opened 10/16/2026

Calcasieu Parish School Board·Louisiana

65% match

Stem Gymnasium Improvements at the Region % Stem Center

Closes 11/2/2026Opened 10/8/2026

Rockbridge County Public Schools·Virginia

65% match

Construction of Recreation Center

Closes 12/1/2026Opened 10/30/2026

Connecticut Albertus Magnus College·Connecticut

65% match

Albertus Magnus College, Ralph Walker Rink – Women’s Locker Room

Closes 11/12/2026Opened 10/27/2026

Rock Hill School District 3·South Carolina

65% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

City of Flagstaff, AZ·Arizona

65% match

Jay Lively Ice Chiller Replacement and Maintenance Project

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of The Treasury·District of Columbia

65% match

Cooling Tower, Roofing, and Structural Construction

Closes 11/9/2026Opened 10/8/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

WELLNESS CENTER RENOVATIONS (MC)atOLNEY HIGHLocated at100 W DUNCANNON AVEPHILADELPHIA PA 19120

Closes 11/5/2026Opened 10/8/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

WELLNESS CENTER RENOVATIONS (PC)atOLNEY HIGHLocated at100 W DUNCANNON AVEPHILADELPHIA PA 19120

Closes 11/5/2026Opened 10/8/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

WELLNESS CENTER RENOVATIONS (EC)atOLNEY HIGHLocated at100 W DUNCANNON AVEPHILADELPHIA PA 19120

Closes 11/5/2026Opened 10/8/2026

California State University, Fullerton·California

65% match

ASI Wellness Initiative, Project No: FL-2673

Closes 11/17/2026Opened 8/31/2026

Trident Technical College·South Carolina

65% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026