Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Camp Swift Bldg. 232 Foundation Repairs

Texas Military Department·Texas

Camp Swift Bldg. 232 Foundation Repairs

Closes 8/11/2026$1M – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Texas Military Department (TMD) is seeking competitive sealed proposals for Camp Swift Bldg. 232 Foundation Repairs located at 1705 Hwy 95 North, Bastrop, Texas 78602. The project includes the execution of construction services to provide a structurally sound repair of the existing barracks foundation, load-bearing walls, and roof assembly that is watertight. The scope of work also includes rough and fine grading within a five-foot perimeter of the building for positive drainage away from the building, and Bermuda sod shall be placed at all disturbed soils and maintained until established to prevent erosion. • The estimated construction budget for the services is $1,300,000.00 for the base and options. • The contract term is approximately 1 year, with the project completion date estimated to be September 2027. • The TMD will issue a Notice to Proceed within 90 days of the contract award, stating the date(s) for beginning work and achieving substantial completion of the work. • The successful respondent will be required to provide a performance period in calendar days, and the contract period will be the number of days issued by the TMD in the Notice to Proceed. • The TMD reserves the right to award all, none, or any sequence of options contingent upon the availability of funds.

Attached files

Contact

Susana Rivera(Contract Developer)

[email protected]

(512) 782-6916

Key dates

Opened
6/4/2026
Questions due
7/14/2026
Pre-bid meeting
6/30/2026Mandatory
Closes
8/11/2026
Projected award
9/4/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
TMD26-CFMO-0044837

Budget estimate

$1,000,000 – $1,500,000

Based on the estimated construction budget of $1,300,000, it can be assumed that the budget for this project will be around this amount. However, the actual budget may vary depending on the specifics of the contract and the work performed. The budget may be influenced by factors such as the complexity of the project, the materials and labor required, and any changes or additions to the scope of work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·North Carolina

Top match · 68%

B. Everett Jordan Concrete Pad Installation

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Defense·Washington

68% match

Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224

Closes 11/13/2026Opened 9/16/2026

U.S. Department Of Defense·Oklahoma

68% match

WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL

Closes 11/16/2026Opened 10/16/2026

U.S. Department Of Defense·Ohio

68% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

Department of Natural Resources·South Carolina

68% match

Georgetown - Cat Meeting House Foundation Improvements

Closes 12/3/2026Opened 10/13/2026

Niagara Frontier Transit Authority (NFTA)·New York

68% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

68% match

AFHC Repair Quarters 82 and 86, Camp Zama, Japan

Closes 12/10/2026Opened 10/23/2026

U.S. Department Of Defense·Texas

68% match

RFI: Fort Wolters H Barracks

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·South Carolina

67% match

Repair Naval Reserve Training Facility B3370

Closes 4/1/2029Opened 3/18/2026

U.S. Department Of Defense·Oklahoma

67% match

Service Repair for Sciaky Spot Welder

Closes 11/28/2026Opened 11/13/2025

U.S. Department Of Defense·South Carolina

67% match

Repair Taxiway Alpha & Bravo - North Auxiliary Airfield

Closes 12/2/2026Opened 10/30/2026

U.S. Department Of Defense·Ohio

67% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Defense·Ohio

67% match

62--LIGHT,LANDING,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·Texas

67% match

Fort Benning Base Operations - W5168W26RA015

Closes 11/13/2026Opened 8/4/2026

U.S. Department Of Defense·United States of America

67% match

17--SLING,AIRCRAFT MAIN, IN REPAIR/MODIFICATION OF

Closes 4/5/2027Opened 9/17/2026

U.S. Department Of Homeland Security·Georgia

67% match

Blue Ridge Community College (BRCC)

Closes 9/19/2029Opened 8/4/2025

U.S. Department Of Defense·Pennsylvania

67% match

20--PRAIRIE AIR,STBD, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 10/27/2026

U.S. Department Of Defense·Nebraska

66% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

Alabama U.S. Marine Corps·Alabama

66% match

Roll Up Door Repairs at Fort Whiting, Mobile

Closes 11/10/2026Opened 10/30/2026

Alabama United States Air Force·Alabama

66% match

McQuay Chiller Repair for 187th FW BLDG 1501

Closes 11/16/2026Opened 10/29/2026

U.S. Department Of Defense·Kentucky

66% match

WH Ford RTC Fueling System Repairs

Closes 11/23/2026Opened 10/20/2026

U.S. Department Of Defense·North Carolina

66% match

Repair Auto Maintenance Facility Bldg 575 (230040)

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·Alaska

66% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Defense·United States of America

66% match

29--FUEL CONTROL,MAIN,T, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·Michigan

66% match

Solicitation: Repair Kit, Tentage

Closes 11/6/2026Opened 10/6/2026