The City of Fresno is seeking a qualified contractor to modify left‑turn phasing at the intersection of N. Millbrook Avenue and E. Alluvial Avenue. The work includes full replacement of traffic‑signal hardware, installation of detector loops, pedestrian crossing upgrades, curb‑ramp and sidewalk construction, street‑light upgrades, and related civil work. The contract is a public‑work project with a construction allocation of $711,340, requiring a Class A or C‑10 California contractor’s license, 10 % bid deposit, and 100 % performance and payment bonds. Bids must be submitted electronically via Planet Bids, with a pre‑bid virtual conference on September 2 2026 and a public bid opening on September 15 2026. The contractor must also use the City’s CMIS system for all project documentation and comply with prevailing‑wage and labor‑code requirements.
• Scope: Traffic‑signal upgrade, left‑turn phasing, new poles, controllers, EVP, APS, pedestrian countdown heads, curb‑ramps, sidewalks, street‑lighting, signing & striping.
• Requirements: CA Class A or C‑10 license, 10 % bid deposit, 100 % performance & payment bonds, electronic bid submission, CMIS usage, prevailing‑wage compliance.
• Timeline: Pre‑bid conference 9/2/2026, bid due 9/22/2026, 80‑working‑day construction period from Notice to Proceed, liquidated damages $500/day for delays.