Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF

U.S. Department Of Agriculture·California

GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF

Closes 9/25/2026$500k – $1MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Forest Service is seeking quotations from small‑business contractors to replace the boardwalk and a 25‑ft bridge on the Sand Pond Trail within Tahoe National Forest (Sierra County, CA). The work includes removal and disposal of existing boardwalk (≈45 ft) and bridge, installation of a new pressure‑treated Douglas‑fir/Larch boardwalk (~1,000 ft linear), construction of a new 25‑ft bridge, placement of 4 passing spaces, installation of 6×6 posts, treated lumber, erosion‑control BMPs, and compliance with Buy‑American, bonding, and insurance requirements. The contract is a total small‑business set‑aside with a period of performance from Oct 1 2026 to Dec 1 2026. • Removal and disposal of existing boardwalk and bridge debris off‑site. • Supply and install pressure‑treated timber (posts, beams, decking, curbs, rails). • Construct a 25‑ft bridge per provided design (no additional engineering required). • Provide four 96‑in passing spaces at specified stations. • Obtain county encroachment permit and comply with water‑withdrawal screening. • Provide required performance and payment bonds, $500,000 insurance minimum, and Buy‑American compliance. • Site access limited to trail ROW; equipment ≤2 tons on the north side of creek; larger equipment allowed for bridge work.

Attached files

Contact

Paula Sales

[email protected]

Key dates

Opened
8/17/2026
Questions due
9/7/2026
Pre-bid meeting
8/26/2026
Site visit
8/26/2026
Closes
9/25/2026
Duration
2 months

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237990
Solicitation №
127EAX26Q0070

Budget estimate

$500,000 – $1,000,000

Based on typical costs for timber boardwalks and small timber bridges in forest settings (material, labor, equipment, bonding, and insurance), a project of roughly 1,000 ft boardwalk plus a 25‑ft bridge typically ranges from $500 k to $1 M. Factors influencing the final amount include timber grade, site‑access constraints, equipment rentals, disposal fees, and any unforeseen weather delays.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of General Services·California

Top match · 64%

CONTRACT: 26-336713; SITE COMPLIANCE AND IMPROVEMENTS ¿ NORTH TAHOE BEACH;CALIFORNIA TAHOE CONSERVANCY; TAHOE VISTA, PLACER COUNTY, CALIFORNIA; PROJECT: 13890

Closes 11/10/2026Opened 10/2/2026

City of Gainesville - Procurement Division·Florida

62% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Kenosha County·Wisconsin

62% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Green Bay·Wisconsin

62% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Open Space Institute·South Carolina

61% match

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Open Space Institute·South Carolina

61% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

U.S. Department Of The Interior·Alaska

61% match

EO14398 TRAIL AGGREGATE - GLBA

Closes 8/17/2027Opened 7/24/2026

Open Space Institute·South Carolina

61% match

The Meadows Boardwalk Trail Project

Closes 11/16/2026Opened 10/27/2026

Delaware County·Pennsylvania

61% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

California Department of General Services·California

60% match

CONTRACT NUMBER: 26-336714; SITE COMPLIANCE AND IMPROVEMENTS ¿ PATTON LANDING CALIFORNIA TAHOE CONSERVANCY CARNELIAN BAY, PLACER COUNTY, CALIFORNIA; PROJECT NUMBER: 13891

Closes 11/10/2026Opened 10/2/2026

City of Farmington·New Mexico

60% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

U.S. Department Of Agriculture·Colorado

60% match

Stove Prairie Campground Gate Replacement

Closes 11/11/2026Opened 10/20/2026

U.S. Department Of The Interior·Colorado

60% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

Massachusetts Department of Developmental Services·Massachusetts

60% match

DDS 27-06 Fire Sprinkler Upgrade Residential Group Home#2, Taunton

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Transportation·New Jersey

60% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026

Alaska Department of Transportation & Public Facilities·Alaska

60% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

U.S. Department Of Agriculture·Illinois

60% match

Hydrant Repair/Replacement, Midewin National Tallgrass Prairie

Closes 11/16/2026Opened 10/29/2026

City of Farmington·New Mexico

59% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Maryland Department of Natural Resources·Maryland

59% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026