Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Mexico
  4. ›Construction
  5. ›Civitan Park Pond Outlet Structure and Conduit Replacement

City of Farmington·New Mexico

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026$350k – $500kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Farmington is seeking a qualified contractor to replace the outlet structure, overflow standpipe, valves, and conduit at Civitan Park Pond. The project includes installing a new 5' × 5' precast concrete outlet structure and selecting one of two conduit installation methods (jack‑and‑bore or open‑cut). Additional work covers valve vault construction, head gates, trash rack, demolition, grouting, erosion control, and site restoration, all in compliance with New Mexico Dam Safety Bureau standards. The contract must be completed within 90 calendar days after notice to proceed, with liquidated damages of $1,500 per day for overruns.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Alena Pioche

[email protected]

(505) 599-1463

Key dates

Opened
10/21/2026
Questions due
11/10/2026
Pre-bid meeting
10/27/2026
Closes
11/19/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
27-169384 Addendum 1

Budget estimate

$350,000 – $500,000

The solicitation lists an Engineer’s Opinion of Probable Construction Costs (OPCC) of $408,000. Considering typical contractor mark‑ups, bonding, and contingencies, the final contract award is likely to fall between $350,000 and $500,000. Factors influencing the range include the selected conduit method (jack‑and‑bore versus open‑cut), site‑specific conditions, and any change‑order adjustments for material price fluctuations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Farmington·New Mexico

Top match · 97%

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Northern Virginia Parks·Virginia

81% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

City of Creve Coeur·Missouri

81% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

North Carolina City of Raleigh·North Carolina

80% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

Delaware County Regional Sewer District·Ohio

80% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

City of Colorado Springs·Colorado

80% match

Parks On-Call Irrigation Repairs

Closes 12/2/2026Opened 10/27/2026

Oregon Parks and Recreation Department·Oregon

80% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

Washington Suburban Sanitary Commission, MD·Maryland

80% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

City of Troy, OH·Ohio

80% match

Miami Shores Golf Course Irrigation System Renovation Project

Closes 11/4/2026Opened 10/14/2026

Town of Camp Verde·Arizona

80% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

City of Boise·Idaho

80% match

Sewer Diversion Structure Rehabilitation (CSP 1175)

Closes 11/4/2026Opened 10/14/2026

City of Charlotte·North Carolina

79% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

City of Casper·Wyoming

79% match

GLENDALE DETENTION POND IMPROVEMENTS

Closes 11/6/2026Opened 10/17/2026

Ohio Department of Natural Resources·Ohio

79% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

City of Charlotte·North Carolina

79% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Charlotte·North Carolina

79% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Redlands·California

79% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Riverside·California

79% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Edmond·Oklahoma

79% match

WC24-00005 NE Complex Phase 1 (Danforth Tower Relocation)

Closes 11/18/2026Opened 10/22/2026

U.S. Department Of Defense·Kentucky

79% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Maryland Chevy Chase Village·Maryland

79% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 11/13/2026Opened 9/30/2026

City of Torrance·California

79% match

Walteria Reservoir Slope Repair, I-181

Closes 12/4/2026Opened 10/28/2026

City of Charlotte·North Carolina

79% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

City of Casper·Wyoming

79% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Oregon Parks and Recreation Department·Oregon

79% match

ITB #14709 Silver Falls State Park Water Supply Well Replacement

Closes 11/2/2026Opened 9/21/2026