Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›TM Fiber Optic Network

U.S. Department Of Commerce·District of Columbia

TM Fiber Optic Network

Closes 7/7/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Department of Commerce, National Telecommunications and Information Administration, is seeking a contractor to rebuild the fiber optic network at the Table Mountain Field Site in Longmont, Colorado. The project involves replacing the existing fiber optic backbone with a new armored, jacketed single-mode fiber optic cable, and installing new networking equipment. The contractor will be responsible for designing and engineering the network, procuring equipment, and constructing the new fiber optic network. The project consists of five main phases: network design and engineering, identify/procure equipment, construction, networking equipment install, and project closeout. The contractor will be required to work closely with the government representative and provide regular updates and deliverables throughout the project. • The project requires the installation of approximately 18 km of armored, jacketed single-mode fiber optic cable. • The contractor will be responsible for terminating the fiber optic cable at each building and field site. • The project includes the installation of new networking equipment, including outside plant boxes and cabinets, pedestals, and fiber distribution bays. • The contractor will be required to perform industry-standard, end-to-end testing of each newly installed fiber pair and CAT 6A cable. • The project has a total duration of 365 days, and the contractor will be required to provide a project plan and schedule.

Attached files

Contact

Jacqueline Brown

[email protected]

(202) 316-2730

Key dates

Opened
6/26/2026
Closes
7/7/2026
Duration
365 days

Last updated

Details

Type
Request for Proposal
Industry
Telecommunications
NAICS
237130
Solicitation №
NTIA000026TMFiber

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity can be estimated based on the scope of work and the materials required. The project involves the installation of approximately 18 km of armored, jacketed single-mode fiber optic cable, as well as the installation of new networking equipment. The cost of the materials and labor required for this project can be significant. Based on industry standards, the cost of installing fiber optic cable can range from $10 to $50 per foot, depending on the type of cable and the complexity of the installation. For this project, the cost of the fiber optic cable alone could be in the range of $180,000 to $900,000. Additionally, the cost of the networking equipment, including outside plant boxes and cabinets, pedestals, and fiber distribution bays, can range from $50,000 to $200,000. The total budget for this opportunity could be in the range of $500,000 to $2,000,000, depending on the complexity of the project and the materials required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Georgia

Top match · 63%

Defense Information Systems Network (DISN) Continental United States (CONUS) Fiber Operation and Maintenance (O&M) – Link 39

Closes 11/11/2026Opened 10/27/2026

City of Sherwood·Oregon

61% match

Fiber to the Home Construction Project

Closes 11/20/2026Opened 10/14/2026

Utility Board of the City of Key West·Florida

61% match

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026

City of Oakland·California

61% match

NTB 1008513 Embarcadero West Rail Safety Project - Near-Term Improvements (NTI)

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

60% match

CABLE,FIBER OPTIC

Closes 11/13/2026Opened 10/27/2026

Columbia Public Schools·Missouri

60% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026

Massachusetts Bay Transportation Authority·Massachusetts

60% match

IFB # 133-26: Furnish Fiber Optic Cable

Closes 11/4/2026Opened 10/8/2026

Lafayette Consolidated Government·Louisiana

60% match

LFT Fiber MDU Installation Stock Material Bid

Closes 11/23/2026Opened 10/16/2026

U.S. Department Of Defense·California

60% match

Sources Sought - Modular Fiber Optic Test Platform

Closes 12/12/2026Opened 1/8/2026

Georgia Butts County Schools (Butts County School District)·Georgia

60% match

RFP - Fiber Optic WAN Service

Closes 11/27/2026Opened 10/27/2026

University of Missouri System·Missouri

60% match

Data Transport Services and Dark Fiber

Closes 12/11/2026Opened 10/22/2026

Columbia Public Schools·Missouri

60% match

RFP NO C 28005 wan fiber services city

Closes 11/16/2026Opened 10/12/2026

Robla School District·California

59% match

OPEN:

Closes 11/23/2026Opened 10/9/2026

Massachusetts Executive Office of Technology Services and Security·Massachusetts

59% match

Notice of Purchase Mass Technology Collaborative

Closes 6/30/2038Opened 7/21/2011

U.S. Department Of Defense·United States of America

59% match

16--FIBER OPTIC ADAPTER - AND OTHER REPLACEMENT PARTS

Closes 11/9/2026Opened 9/25/2026

Navajo Nation·Arizona

59% match

Proposal for Lit Fiber With Special Construction -NM Location Only ADDENDUM #2

Rolling / TBD closeOpened 9/11/2026

City of Oakland·California

59% match

HOME MEDICAL EQUIPMENT: LIFT CHAIRS - 470.45 FURNITURE, SPECIA CHAIRS

Closes 11/12/2026Opened 10/9/2026

Michigan Wayne-Westland Community School District·Michigan

59% match

DISTRICT FIBER UPGRADES

Closes 11/18/2026Opened 10/16/2026

Oregon Northern Wasco County PUD·Oregon

59% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

Navajo Nation·Arizona

59% match

Proposal for Lit Fiber With Special Construction -AZ Location Only ADDENDUM #2

Rolling / TBD closeOpened 9/11/2026

Maryland The Secretary’s Office·Maryland

59% match

Fiber Channel Switches

Closes 11/4/2026Opened 9/11/2026

Northern Wasco County Peoples Utility District·Oregon

58% match

Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

58% match

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

NYS Onondaga County·New York

58% match

FIBER OPTIC DESIGN AND OPTIONAL CONSTRUCTION MANAGEMENT

Closes 11/27/2026Opened 10/29/2026

Robla School District·California

58% match

OPEN:

Closes 11/23/2026Opened 10/9/2026