Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›14--COVER,ERECTOR LAUNC

U.S. Department Of Defense·Virginia

14--COVER,ERECTOR LAUNC

Closes 11/12/2025$251k – $1.3MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The proposed procurement is for a COVER,ERECTOR LAUNC with NSN 1440011272427. The procurement has two lines: Line 0001 for 250 units and Line 0002 for 1 unit. All responsible sources may submit a quote, which will be considered if received timely. Quotes must be submitted electronically. The delivery location is W1A8 DLA DISTRIBUTION, and the delivery dates are 0213 days and 0153 days for the two lines, respectively. • The procurement is for a specific product with a given NSN. • The quantity of the product varies between the two lines. • The delivery location and dates are specified. • Quotes must be submitted electronically.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
11/3/2025
Closes
11/12/2025

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
336419
Solicitation №
SPE4A626T7332

Budget estimate

$251,000 – $1,255,000

The budget for this procurement cannot be directly estimated from the document, as it does not specify the price or the total value of the procurement. However, considering the quantities and the product being procured, a rough estimate could be made based on the average price of similar products. Assuming an average price of $1,000 to $5,000 per unit, the total budget for the 251 units could be between $251,000 and $1,255,000. This is a very rough estimate and should be used as a rough order of magnitude. Factors that may influence the likely payment range include the complexity of the product, the production costs, and the competition among suppliers.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 66%

15--COVER ASSEMBLY

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

65% match

SEAT,ACCESS COVER

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

65% match

53--COVER,ACCESS

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

65% match

COVER,PROTECTIVE,TO

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

64% match

14--ADAPTER ASSEMBLY,MI, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

64% match

10--COVER,GUN MOUNT

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Defense·Alabama

64% match

29--COVER AND SOLENOID ASS

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

64% match

SEAT,ACCESS COVER

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

64% match

FD2030-26-00835

Closes 3/13/2027Opened 1/7/2026

U.S. Department Of Defense·Virginia

64% match

19F | F-15 | COVER, PILOT AND SHU

Closes 11/11/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

64% match

FD2030-26-01533

Closes 3/30/2027Opened 3/30/2026

U.S. Department Of Defense·United States of America

64% match

59--COVER,ELECTRICAL CONNE

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

64% match

41--COVER,AIR CONDITIONER

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

64% match

25--COVER,VEHICULAR COMPON

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·Virginia

64% match

05F | COVER, PITOT TUBE, AI | C-130

Closes 12/14/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

64% match

15--COVER,ACCESS,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 2/2/2027Opened 9/17/2026

U.S. Department Of Defense·United States of America

64% match

25--COVER,VEHICULAR COMPON

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Michigan

64% match

Cover Transmission

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·Illinois

64% match

Strut arm ring springs and suitable surface and filler lubricants Jerry F. Costello Lock and Dam W912P9

Closes 11/6/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

63% match

14--PANEL,STRUCTURAL,AI - AND OTHER REPLACEMENT PARTS

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of Defense·Missouri

63% match

15--COVER,ACCESS,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 8/13/2026

U.S. Department Of Defense·United States of America

63% match

17--COVER,AIRCRAFT ENGINE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

63% match

42--PROTECTIVE COVER,AIRCR

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

10--COVER,TERMINAL

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·Georgia

63% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 9/29/2026