Cube Construction Services LLC is soliciting proposals for the NYCDDC Records Room Reconstruction at Hirsch Center project, located at 421 East 26th Street, New York, NY 10016.
Project Owner: DDC
Project Labor Agreement is Applicable.
Work location: 421 East 26th Street, NY, 10016
Working Time: Regular hours, Coordination required for After Hours work if required.
Proposal Due: 07/08/2026. 11:00 a.m.
Please use the link below to access the project drawings, specifications, addenda, and photos: https://www.dropbox.com/scl/fo/q8ziz4ejcs1uieiuelo9l/AH6H4-SbKK8spSBmyYyDtsc?rlkey=gp6ov3xmjaw0vrek5sh07t1u5&st=ux51n1h6&dl=0The scope of work includes, but is not limited to:
Demolition
Remove existing finishes, partitions, ceilings, and associated components
Architectural
Provide and install metal framing and gypsum board systems
Supply and install doors, frames, and hardware
Install glazed partitions and glazing
Provide ceiling systems including acoustical and gypsum board ceilings
Supply and install flooring systems including resilient, tile, terrazzo, and carpet
Install wall finishes including simulated stone and tiles
Perform interior painting
Install architectural woodwork, cabinetry, and paneling
Supply and install demountable partitions
Supply and install furniture as per given schedule
Install decorative metal and unit covers
Provide and install countertops
Specialty
Provide and install signage and visual display units
Install toilet and bath accessories
Provide fire protection cabinets and fire extinguishers
Supply and Install mobile storage shelving systems
Provide and install pantry and refrigeration appliances
Fire Suppression
Modify and extend existing sprinkler system
Install piping, sprinkler heads, valves, and fittings
Perform testing and commissioning
Mechanical
Modify existing HVAC systems as required
Install ductwork, piping, insulation, and air distribution systems
Supply and install diffusers, grilles, and associated equipment
Perform testing, adjusting, balancing, and commissioning
Supply: HVAC Equipment
Supply variable air volume terminal boxes, toilet exhaust fan, ceiling diffusers, exhaust grilles, return/transfer grilles, slot diffusers
Electrical
Install power distribution systems and wiring devices
Install lighting fixtures and lighting controls
Provide conduits, raceways, and supports
Perform testing and commissioning
Supply: Light Fixtures
Supply light Fixtures as per contract documents.
Fire Alarm
Perform fire alarm related work as per the construction documents
Plumbing
Install domestic water, sanitary waste, and vent systems
Provide and install plumbing fixtures, valves and accessories
Provide pipe insulation for plumbing systems
Perform testing and commissioning
Supply: Plumbing Fixture
Provide Plumbing Fixtures and Accessories as per the schedule.
Sprinkler
Removal and installation of the core and branches sprinkler piping and heads as per the contract documents.
Safety, Security and Telecom
Supply and install video surveillance devices
Supply and install the access control system
Provide the homerun from each device to the ACP
Supply and install the communication system, including low-voltage cabling, patch panels, and data outlets
Provide CAT 6 cables for security cameras
Provide supports with ladder racks, J hooks every 5 feet etc.
Audio Visual
Supply and install all AV equipment as per given schedule AV-300
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
Total MWBE Goals: 30.00%