Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›AMPLIFIER POWER GRO

U.S. Department Of Defense·Pennsylvania

AMPLIFIER POWER GRO

Closes 4/16/2026$100k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Navy is seeking a contractor to repair AMPLIFIER POWER GRO equipment. The contractor must meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed in the contract. The repair work shall be performed in accordance with the contractor's repair/overhaul standard practices, manuals, and directives. The Government is seeking a Repair Turnaround Time (RTAT) of 363 days. The contractor must provide a quote that includes the unit price, total price, and repair turnaround time. The contract also requires the contractor to perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. Some key points to consider are: • The contractor must meet the Government's Required Repair Turnaround Time (RTAT) of 363 days. • The contractor must provide a quote that includes the unit price, total price, and repair turnaround time. • The contract requires the contractor to perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. • The contractor must comply with all applicable documents, including Military/Federal Specifications and Standards, Data Item Descriptions (DIDs), and other DODSSP Products.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Adolphe J. Andou(Procurement Contracting Officer)

[email protected]

(771) 229-0381

Key dates

Opened
1/28/2026
Closes
4/16/2026
Duration
363 days

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
334290
Solicitation №
N0010426QDA40

Budget estimate

$100,000 – $500,000

The budget for this opportunity is not explicitly stated in the document. However, based on the information provided, it can be estimated that the budget will be in the range of $100,000 to $500,000. This estimate is based on the fact that the contract is for the repair of electronic equipment, and the required Repair Turnaround Time is 363 days. The actual budget will depend on the complexity of the repair work, the cost of materials, and the labor costs. Factors that may influence the likely payment range include the cost of materials, labor costs, and the complexity of the repair work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 71%

AMPLIFIER POWER GRO

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·California

63% match

Power Amps

Closes 11/5/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

62% match

16--AMPLIFIER POWER SU, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

60% match

16--AMPLIFIER POWER SU, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/16/2026

City of Asheville·North Carolina

59% match

Amplifiers for Harrah’s Cherokee Center – Asheville

Closes 11/10/2026Opened 10/5/2026

U.S. Department Of Energy·California

58% match

UPDATED ALS SHB pulsed RF HPA

Closes 11/18/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

58% match

AMPLIFIER,RADIO FRE

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·California

58% match

IPG Photonics Amplifier

Closes 11/6/2026Opened 10/29/2026

U.S. Department Of Defense·District of Columbia

57% match

Microwave RF Amplifiers

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

57% match

POWER SUPPLY

Closes 11/9/2026Opened 10/28/2026

U.S. Department Of Defense·Ohio

56% match

Electricity 2027

Closes 11/9/2026Opened 10/6/2026

Pennsylvania Public Utility Commission·Pennsylvania

56% match

Electric Resource Adequacy Consultant

Closes 11/6/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

56% match

Peak Power Analyzer, Peak Power Sensors, and Power Sensor Cables

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

55% match

POWER SUPPLY

Closes 11/30/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

55% match

COMBINED SYNOPSIS/SOLICITATION AMPLIFIER,AUDIO FRE

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·New Mexico

55% match

High Power Electromagnetics (HPEM) Modeling and Effects BAA

Closes 12/20/2026Opened 11/30/2022

U.S. Department Of Defense·United States of America

55% match

POWER SUPPLY

Closes 11/30/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

55% match

59--AMPLIFIER,AUDIO FREQUE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

55% match

POWER DISTRIBUTION

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·Alaska

55% match

FTG247 Replace UPS at IDT1, Fort Greely, Alaska

Closes 12/12/2026Opened 4/3/2025

NYS Rochester-Genesee Reg. Transportation Authority·New York

55% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Defense·Ohio

55% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

North Carolina City of Asheville·North Carolina

55% match

Amplifiers

Closes 11/10/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

55% match

POWER SUPPLY

Closes 11/16/2026Opened 10/19/2026

Florida State University·Florida

55% match

Rotary Uninterruptible Power System

Closes 11/2/2026Opened 9/8/2026