Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Indiana guideIndiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Indiana
  4. ›Construction
  5. ›EVANSVILLE-VANDERBURGH AIRPORT AUTHORITY DISTRICT REGIONAL…

CHA Consulting, Inc.·Indiana

EVANSVILLE-VANDERBURGH AIRPORT AUTHORITY DISTRICT REGIONAL AIRPORT – FLIGHTLINE DRIVE UTILITY EXTENSION

Closes 12/2/2026$1M – $5MInvitation for BidLogin required
Get bids like this by emailBid source

Description

This solicitation covers the removal and replacement of existing water, sewer, and storm utility infrastructure along Flightline Drive at Evansville Regional Airport, as well as associated roadway demolition, paving, curb, drainage, and fencing improvements. The work includes extensive excavation, sub‑grade treatment, and placement of new utility lines and pavement structures, with a pre‑bid meeting required for interested contractors. • Demolition and removal of existing water, sanitary, and storm sewer lines (approximately 600 – 1,300 LF each) and related structures (manholes, inlets, guardrails, fences). • Sub‑grade treatment, milling, and installation of new HMA base and surface layers (≈ 400 tons total). • Installation of new water lines (½‑8 in.) and associated concrete work, drainage improvements, and new curbs/gutters. • Project location at 7801 Bussing Dr, Evansville, IN 47725; schedule driven by a December 2026 bid deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Clint Weimer

[email protected]

Key dates

Opened
10/29/2026
Questions due
11/23/2026
Pre-bid meeting
11/12/2026
Closes
12/2/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
101463.000

Budget estimate

$1,000,000 – $5,000,000

Based on the extensive utility removal (several hundred linear feet of multiple pipe sizes), roadway milling, sub‑grade treatment, and new HMA paving, comparable airport utility projects typically range from $1 million to $5 million in total contract value. The high volume of materials (e.g., 1,590 SY of milling, 400 + tons of HMA) and the need for specialized crews (water‑sewer, pavement, grading) push the estimate toward the upper half of that range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fayetteville·Arkansas

Top match · 82%

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

Delta Airport Consultants·Virginia

81% match

COMING SOON - Roanoke, VA - Roanoke-Blacksburg Reg. Airport - Rehabilitate Runway 6-24 (24072)

Rolling / TBD closeOpened 5/1/2026

Wisconsin Department of Transportation Bureau of Aeronautics·Wisconsin

81% match

Expand Economy Parking Lot – Dane County Regional Airport (MSN1022 - Contract 1)

Closes 11/19/2026Opened 10/26/2026

City of Fayetteville·Arkansas

80% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

Chesterfield County Airport·Virginia

80% match

Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 - Package 1 (20030)

Rolling / TBD closeOpened 10/22/2026

Wisconsin Department of Transportation Bureau of Aeronautics·Wisconsin

79% match

Sidewalk Construction – Dane County Regional Airport (MSN1022 – Contract 2)

Closes 11/19/2026Opened 10/27/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge (Greater Baton Rouge Airport District)·Louisiana

79% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/13/2026

City of Fort Myers·Florida

79% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

City of Lynchburg·Virginia

79% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

City of Mankato·Kansas

79% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Port of Portland·Oregon

79% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Georgia Turner County Board of Commissioners·Georgia

79% match

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

Delta Airport Consultants·Virginia

79% match

Farmville, VA - Farmville Regional Airport - Replace RW 3-21 PAPI'S (24062)

Rolling / TBD closeOpened 10/22/2026

Ohio City of Westerville·Ohio

79% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Georgia City of Valdosta·Georgia

78% match

Stallings Lift Station & Force Main Improvements

Closes 11/5/2026Opened 8/11/2026

Raleigh Durham Airport Authority·North Carolina

78% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Franklin County Board of County Commissioners·Florida

78% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

78% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

Goodwyn Mills Cawood·Alabama

78% match

Apron Expansion at Evergreen Regional Airport at Middleton Field

Closes 11/20/2026Opened 10/28/2026

City of Elko·Nevada

78% match

AIP 3-32-0005-064-2026 Rehabilitate Terminal Building Sidewalks- Re-Bid TBD

Rolling / TBD closeOpened 10/7/2026

City of Fayetteville, Arkansas·Arkansas

78% match

Bid 26-56, Construction – FYV Hangar Infrastructure Improvements Phase 2

Closes 11/3/2026Opened 10/11/2026

Nevada Government·Nevada

78% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Tampa International Airport·Florida

78% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

City of Chicago·Illinois

78% match

Airside and Landside Concrete and Maintenance for O’ Hare and Midway International Airports

Closes 11/18/2026Opened 10/13/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

78% match

Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026