The Union County Board of Supervisors, in conjunction with the Mississippi Office of State Aid Road Construction, is seeking sealed bids for the micro‑seal, base repair, leveling, and striping of approximately 15.639 miles of county roads (CR 1, CR 73, CR 82, CR 121, CR 194, CR 197). The scope includes mobilization, removal of existing traffic striping, extensive excavation, placement of granular base material, multiple layers of asphalt and micro‑surfacing, installation of traffic signs, reflective markers, and edge stripes, as well as maintenance of traffic and signage upgrades. The contract duration is set at 90 working days, and the lowest qualified bid will be awarded. Bidders must provide a certified check or 5 % bid bond payable to Union County and the State of Mississippi.
• Detailed quantities of materials (e.g., 1,766 tons of 12.5 mm asphalt, 48,704 gal of emulsified asphalt for micro‑surfacing, 2,000 + traffic signs and markers).
• Requirements for plans and specifications: purchase from County Engineer Larry L. Britt ($75 for plans, $30 for proposal).
• Bid submission deadline: 10:00 AM CDT, 5 June 2026; bids to be delivered to the Union County Chancery Building.
• Mandatory 5 % bid bond and compliance with Mississippi Standard Specifications for State Aid Road and Bridge Construction.