The City of Milwaukee is seeking sealed bids for a comprehensive sanitary sewer rehabilitation project that includes lateral pipe replacement, lead service line removal, and new sump pump installations within the area bounded by North 54th to North 58th Streets and West Vienna Avenue to West Capitol Drive. The scope covers excavation, installation of CIPP pipe connections, storm sewer upgrades, copper water service installation, meter setting, site restoration, and associated traffic control and safety measures. The contract requires a 10% bid security and performance bonding, with compliance obligations for Small Business Enterprise (SBE), Residents Preference Program (RPP), apprenticeship, and Build America/Buy America provisions.
• Replace 40 sanitary main‑to‑lateral CIPP connections and 2,400 ft of new sanitary sewer lateral.
• Install copper water service lines (405 ft short, 405 ft long, 810 ft private side) and associated meter setting.
• Perform site work including tree clearing, storm building sewer installation (600 ft), pre‑construction site visits, mobilization, site restoration, and traffic control.
• Provide bid security equal to 10% of the base bid, required performance/payment bonds, and comply with extensive local, state, and federal labor and procurement regulations.
• Completion required by October 30 2026 with a total of 60 work days allowed for construction.