Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Civil Engineering
  5. ›Black Brook - Black Creek Drainage Study

NYS Ontario County·New York

Black Brook - Black Creek Drainage Study

Closes 4/20/2026$500k – $2MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Summary The County of Ontario (the "County"), is requesting Proposals for RFP# R26056 Black Brook - Black Creek Drainage Study. Proposals are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/ontariocountyny PRIOR TO 4:00 pm on Thursday, April 16, 2026. Late responses will not be accepted. Project work includes conduct a comprehensive stream corridor study and hydrologic modeling for the Black Brook–Black Creek Hydrologic Unit 12 (HUC 12) watershed in Ontario County, New York, encompassing portions of the Towns of Farmington, Manchester, and Canandaigua. Background Black Brook (approximately 4.8 stream miles) and Black Creek (approximately 5.9 stream miles) flow east through the Town of Farmington and discharge to the Canandaigua Outlet in the Town of Manchester. Roughly half of the watershed is in active agricultural use, including soils classified as prime farmland or of statewide significance. The watershed also contains critical freight rail lines and major vehicular and trucking corridors that support local, regional, and national transportation networks. Existing hydrologic information for the watershed is limited and outdated. FEMA floodplain mapping is more than 40 years old and does not reflect significant land use changes over recent decades. Since 2010, the Town of Farmington has experienced a 17 percent population increase and the issuance of approximately 1,210 new building permits, underscoring the need for updated flood and hydrologic analysis. The study must be conducted in accordance with New York State Department of Environmental Conservation (DEC) stream corridor assessment guidelines (see Appendix C Stream Corridor Assessment Guide) and will include field data collection and characterization of stream channels, banks, floodplains, riparian areas, tributary confluences and upland areas for Black Brook and Black Creek. Hydrologic modeling will evaluate watershed response under a range of wet-weather scenarios to identify areas of concern and appropriate mitigation strategies. Select locations may warrant more detailed hydraulic analysis, such as HEC-RAS modeling to support bridge replacement or other engineering design needs. HEC-RAS modeling will be completed within the project budget as feasible or may be addressed in a subsequent project if costs exceed available funding. This watershed-scale study is intended to support a holistic, intermunicipal approach to managing water flow and drainage, with careful consideration of upstream and downstream impacts. A stakeholder advisory committee composed of representatives from municipalities, county agencies, and the agricultural community will provide guidance, data, and local knowledge to the project Consultant. The project will be managed by Linda Phillips of the Ontario County Planning Department, and Ontario County will contract directly with the selected consultant or consultant team. The anticipated project timeline is May 2026 through December 2027 Timeline Release Project Date: March 20, 2026 Question Submission Deadline: April 2, 2026, 5:00pm Response Submission Deadline: April 20, 2026, 4:00pm Contractor Selection Date: May 21, 2026 Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 3.50% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 8.80% WBE Goal: 8.80%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jenifer Langer(Purchasing Director)

[email protected]

(585) 396-4444

Key dates

Opened
3/23/2026
Questions due
4/7/2026
Closes
4/20/2026
Projected award
5/21/2026
Duration
20 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
R26056

Budget estimate

$500,000 – $2,000,000

The budget for this project is not explicitly stated in the document. However, based on the scope of work, which includes a comprehensive stream corridor study and hydrologic modeling, the budget could be substantial. Considering the project duration of 20 months and the complexity of the work, a reasonable estimate for the budget could be in the range of $500,000 to $2,000,000. This estimate is based on the assumption that the project will require a team of engineers, hydrologists, and other experts to complete the study and modeling. The actual budget could be higher or lower, depending on the specific requirements of the project and the bidder's proposal.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fitchburg·Wisconsin

Top match · 67%

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Laramie Rivers Conservation District·Wyoming

66% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Santa Clara Valley Water District·California

66% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

Orange County, Florida·Florida

66% match

Bonnie Brook Subdivision Drainage Improvements Engineering Design Services

Closes 11/17/2026Opened 10/15/2026

City of Austin·Texas

66% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

Greenville County·South Carolina

65% match

Huff Creek Watershed Reservoir Maintenance

Closes 11/20/2026Opened 10/30/2026

County of Ontario·New York

65% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

Washakie County Conservation District·Wyoming

65% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Michigan Department of Technology, Management & Budget (DTMB)·Michigan

65% match

472/26613.TAP; Boston Pond - Dam Study

Closes 11/19/2026Opened 10/29/2026

St. Louis County, MN - Purchasing Division·Minnesota

65% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

City of Charlotte·North Carolina

65% match

Craighead/Tryon Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/14/2026

City of Charlotte·North Carolina

65% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

Pee Dee Regional Council of Governments·South Carolina

65% match

Stormwater Drainage Study

Closes 12/1/2026Opened 10/20/2026

City of Dubuque·Iowa

65% match

North Fork Catfish Creek Multi-Site Design Services

Closes 11/6/2026Opened 10/9/2026

NYS Ontario County·New York

65% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

Town of Blacksburg·South Carolina

65% match

Blacksburg Ground Water Source Evlauation

Closes 11/18/2026Opened 10/16/2026

California Grants·California

64% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Consolidated Grant Program

Rolling / TBD closeOpened 10/9/2025

NYS Cambria, Town of·New York

64% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Greenville County·South Carolina

64% match

HUFF CREEK WATERSHED RESERVOIR MAINTENANCE

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of The Interior·Colorado

64% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

City of Charlotte·North Carolina

64% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

California Grants·California

64% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026