Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Environmental Services
  5. ›ITB: Pender County Soil and Water Streamflow…

Pender County·North Carolina

ITB: Pender County Soil and Water Streamflow Rehabilitation Assistance Program, East/ Mill Branch

Closes 10/14/2026$50k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pender Soil and Water Conservation District is seeking sealed bids from qualified contractors to perform stream‑debris removal on Mill Branch and East Mill Branch in Pender County, NC. The work includes clearing tree limbs, brush, rubbish, and other obstructions that impede flow, removing trees leaning >45°, and properly processing and disposing of woody debris off‑site according to STRAP guidelines. Contractors must complete the contract within six months of award, provide a $1 M liability insurance policy, furnish a performance bond for the total bid amount, and obtain all required permits. A mandatory site visit is required before bidding, and bidders must submit a single total price (not per‑foot) with supporting experience letters. Bids are due 3 PM Oct 14 2026; opening is at noon Oct 15 2026. • Scope: Stream debris removal, tree removal, debris processing & off‑site disposal. • Location: Mill Branch (≈18,861 ft) and East Mill Branch (≈2,023 ft) in Pender County, NC. • Contract value: Not disclosed; bidders submit total lump‑sum price. • Insurance: $1 M liability required; performance bond equal to bid amount. • Timeline: Work must start within 30 days of award and be finished within 6 months. • Mandatory site visit; no pre‑bid meeting. • Submission: Sealed envelope to P.O. Box 248 or 801 S. Walker St., Burgaw, NC.

Attached files

Contact

(910) 259-9123

Key dates

Opened
9/30/2026
Closes
10/14/2026
Duration
6 months

Last updated

Details

Type
Invitation for Bid
Industry
Environmental Services
NAICS
237990
Solicitation №
44

Budget estimate

$50,000 – $200,000

The solicitation does not disclose a budget. Based on typical rates for stream‑clearing projects in North Carolina (approximately $5‑$15 per linear foot for woody debris removal, plus equipment mobilization), the total cost could range from roughly $50,000 for a minimal scope to $200,000 for a full‑service contract with heavy equipment, insurance, bonding, and disposal fees. Factors influencing the final amount include length of stream cleared, density of debris, equipment used (e.g., excavators, barges), and disposal logistics.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

St. Louis County, MN - Purchasing Division·Minnesota

Top match · 75%

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

Dickenson County·Virginia

72% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Augusta County Service Authority dba Augusta Water·Virginia

72% match

ITB 2702 Augusta Water Collection System Rehabilitation

Closes 12/3/2026Opened 10/29/2026

North Carolina County of Mecklenburg·North Carolina

71% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

California Grants·California

71% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

71% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

California Grants·California

71% match

Proposition 68 Technical Assistance

Rolling / TBD closeOpened 9/5/2024

California Grants·California

71% match

County-wide and Regional Funding Program

Rolling / TBD closeOpened 8/21/2024

Maryland Wicomico County Government·Maryland

71% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/14/2026

Iowa Department of Transportation·Iowa

71% match

1035.00 Credits of Stream Mitigation- Jones County

Closes 11/2/2026Opened 10/7/2026

Gwinnett County Government·Georgia

71% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Gwinnett County Government·Georgia

70% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Gaithersburg·Maryland

70% match

Construction Services for Rabbitt Road Stream and Vegetative Buffer Restoration

Closes 11/9/2026Opened 9/15/2026

County of Moore·North Carolina

70% match

Engineering Services - East Moore Water District Phase 5 Water Main Extension

Closes 11/12/2026Opened 10/22/2026

Carroll County·Maryland

70% match

IFB Utility System Repair and Replacement Services

Closes 11/18/2026Opened 10/29/2026

City of Fitchburg·Wisconsin

70% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·Illinois

70% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

Prince William County Service Authority·Virginia

70% match

IFB SA 2707 General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping, and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

Maryland Charles County Government·Maryland

70% match

ITB 27-008 On-Call Maintenance, Repair and Upgrade of Utilities Infrastructure

Closes 11/17/2026Opened 10/9/2026

Greenville County·South Carolina

70% match

HUFF CREEK WATERSHED RESERVOIR MAINTENANCE

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·Mississippi

70% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

Washakie County Conservation District·Wyoming

69% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

County of Ontario·New York

69% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

California Grants·California

69% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

Metropolitan Council·Minnesota

69% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026