Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Vermont
  4. ›Engineering Services
  5. ›Stormwater Flow Restoration Design projects in Shelburne

Town of Shelburne·Vermont

Stormwater Flow Restoration Design projects in Shelburne

Closes 5/22/2026$100k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Shelburne is seeking consultant services to prepare engineering design plans for two Flow Restoration Plan sites in Shelburne. The selected consultant will be responsible for preparing engineering design plans to meet compliance for the two sites, including conducting a thorough analysis to confirm what permits will be required for the projects. The consultant will also be responsible for overseeing a licensed surveyor to conduct topographic surveys and preparing an existing conditions site plan. The proposal should include a cover letter, scope of work, project organization, proposed schedule, cost proposal, and schedule of rates. • The consultant will be responsible for preparing engineering design plans for two Flow Restoration Plan sites in Shelburne. • The consultant will conduct a thorough analysis to confirm what permits will be required for the projects. • The consultant will oversee a licensed surveyor to conduct topographic surveys and prepare an existing conditions site plan. • The proposal should include a cover letter, scope of work, project organization, proposed schedule, cost proposal, and schedule of rates.

Attached files

Contact

Shayne Geiger(Consultant Services Coordinator)

[email protected]

(802) 264-5042

Key dates

Opened
4/22/2026
Closes
5/22/2026
Duration
4 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
73661

Budget estimate

$100,000 – $500,000

The estimated budget for this opportunity is between $100,000 and $500,000. This estimate is based on the scope of work, which includes preparing engineering design plans for two Flow Restoration Plan sites in Shelburne, conducting a thorough analysis to confirm what permits will be required for the projects, and overseeing a licensed surveyor to conduct topographic surveys and prepare an existing conditions site plan. The actual budget may vary depending on the complexity of the projects and the consultant's rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 72%

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

71% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

Covington Municipality·Rhode Island

71% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

City of Charlotte·North Carolina

70% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

City of Charlotte·North Carolina

70% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

70% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

City of Charlotte·North Carolina

70% match

Piccadilly Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

City of Charlotte·North Carolina

70% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

70% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Charlotte·North Carolina

70% match

Bruns Academy Water Quality Enhancement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

70% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Charlotte·North Carolina

70% match

Rocky Falls Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2028

City of Charlotte·North Carolina

70% match

Laurel Avenue Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2027

City of Fitchburg·Wisconsin

69% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

City of Charlotte·North Carolina

69% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Charlotte·North Carolina

69% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

69% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Charlotte·North Carolina

69% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

69% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Charlotte·North Carolina

69% match

Chatham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

City of Charlotte·North Carolina

69% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

Sterling Heights·Michigan

69% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

City of Cape Canaveral·Florida

69% match

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

City of Charlotte·North Carolina

69% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

68% match

Euclid Avenue 1818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027