Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Water and Wastewater
  5. ›Lift Station 5 Rehab – Water Pollution Control

City of Flint·Michigan

Lift Station 5 Rehab – Water Pollution Control

Closes 12/3/2025$1.3M – $1.6MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flint seeks a qualified contractor to fully reconstruct Lift Station #5, a critical water‑pollution‑control facility. The scope includes complete demolition of the existing above‑grade structure, new concrete and masonry construction, roof system installation, full mechanical, electrical, and instrumentation systems, and integration with existing below‑grade components. The work must comply with a extensive set of technical specifications covering civil, structural, mechanical, electrical, HVAC, fire‑stop, and instrumentation disciplines, and must meet local‑preference pricing rules. Bidders must submit both hard‑copy and electronic proposals, attend a mandatory pre‑bid meeting, and provide bonding, insurance, and certification documents. • Demolition of existing building, utility disconnections, and site preparation. • New construction of CMU walls, reinforced concrete pads, EPDM‑membrane roofing, and steel structural elements. • Installation of mechanical equipment (fans, heaters), full electrical power distribution, PLC‑based control system, and gas‑detection instrumentation. • Compliance with Michigan Building Code, ACI, AISC, SMACNA, NEC, and hazardous‑area standards, plus a $25,000 utility allowance for coordination with Consumers Energy.

Attached files

Contact

Lauren Rowley(Purchasing Manager)

[email protected]

(810) 766-7264

Key dates

Opened
10/27/2025
Questions due
11/7/2025
Pre-bid meeting
11/5/2025Mandatory
Closes
12/3/2025
Duration
1 year

Last updated

Details

Type
Request for Proposal
Industry
Water Management and Sanitation
NAICS
237310
Solicitation №
P26-522

Budget estimate

$1,267,000 – $1,579,000

The two bids received total $1,267,000 and $1,579,000, indicating the contract value is in the $1.3‑$1.6 million range. Considering typical allowances for contingencies, inflation, and potential change orders, a reasonable estimate for the final budget would be roughly $1.3 million to $1.6 million. Factors influencing the final amount include the $25,000 utility allowance, bonding and insurance costs, and any scope adjustments introduced after bid evaluation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 75%

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

U.S. Department Of Health And Human Services·South Dakota

74% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

City of Lino Lakes·Minnesota

72% match

Lift Station #53 Rehabilitation

Closes 11/5/2026Opened 10/14/2026

League City·Texas

72% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Hollywood·Florida

71% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

71% match

Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026

City of Key West·Florida

71% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Gwinnett County Government·Georgia

71% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Montpelier·Vermont

70% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

City of League City·Texas

70% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Hollywood·Florida

70% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Hollywood·Florida

70% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Village of Cary·Illinois

70% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

City of San Diego·California

70% match

North City Water Reclamation Plant Filter Media Cleaning

Closes 11/6/2026Opened 9/2/2026

The Metropolitan Water District of Southern California·California

70% match

Solids Removal and Disposal Services for MWD Skinner Water Treatment Plant

Closes 11/19/2026Opened 10/15/2026

City of Laguna Beach·California

69% match

Old Top of the World Lift Station Rehabilitation - Phase II

Closes 11/10/2026Opened 10/9/2026

City of Mandeville·Louisiana

69% match

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

City of Wilton Manors·Florida

69% match

Lift Station No. 4 Replacement

Closes 11/10/2026Opened 10/8/2026

City of Chicago·Illinois

69% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Orlando·Florida

69% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

City of Charlotte·North Carolina

69% match

Elevated Water Tank Rehabilitation

Rolling / TBD closeOpened 1/12/2027

City of Neptune Beach·Florida

69% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

Metropolitan Council·Minnesota

69% match

Metro Plant Ash Cleaning Services

Closes 11/10/2026Opened 9/23/2026

City of Montpelier·Vermont

69% match

Wastewater Collection Suction Lift Pump Systems

Closes 11/26/2026Opened 10/28/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026