The City of Flint seeks a qualified contractor to fully reconstruct Lift Station #5, a critical water‑pollution‑control facility. The scope includes complete demolition of the existing above‑grade structure, new concrete and masonry construction, roof system installation, full mechanical, electrical, and instrumentation systems, and integration with existing below‑grade components. The work must comply with a extensive set of technical specifications covering civil, structural, mechanical, electrical, HVAC, fire‑stop, and instrumentation disciplines, and must meet local‑preference pricing rules. Bidders must submit both hard‑copy and electronic proposals, attend a mandatory pre‑bid meeting, and provide bonding, insurance, and certification documents.
• Demolition of existing building, utility disconnections, and site preparation.
• New construction of CMU walls, reinforced concrete pads, EPDM‑membrane roofing, and steel structural elements.
• Installation of mechanical equipment (fans, heaters), full electrical power distribution, PLC‑based control system, and gas‑detection instrumentation.
• Compliance with Michigan Building Code, ACI, AISC, SMACNA, NEC, and hazardous‑area standards, plus a $25,000 utility allowance for coordination with Consumers Energy.