Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›Water Treatment Plant Maintenance Package ‘A’; Project No…

City of Hollywood·Florida

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026$1M – $3MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Hollywood is soliciting bids for the repair and refurbishment of six major components at its Water Treatment Plant (WTP) under Maintenance Package “A.” The work includes lime silo repairs, replacement of silo dust collectors, replacement of the sludge drum thickener and associated building repairs, valve replacements on storage tanks 3 and 4, and replacement of clearwell sample lines. All work will be performed under a single prime contract at the WTP located at 3441 Hollywood Boulevard, Hollywood, FL. The contractor must provide all labor, materials, equipment, permits, insurance, bonds, and comply with City, State, and Federal regulations. The contract term is 210 calendar days from award, with the possibility of a 120‑day extension. Bids are due electronically via the City’s OpenGov portal by 3:00 PM on 25 Nov 2026. • Scope: repair/replacement of lime silo, dust collectors, sludge drum thickener, storage‑tank valves, clearwell sample lines. • Location: City of Hollywood Water Treatment Plant, 3441 Hollywood Blvd, Hollywood, FL 33021. • Contract type: single‑prime “Invitation for Bid” (IFB). • Contract duration: 210 days (plus possible 120‑day extension). • Mandatory pre‑bid: none (pre‑bid conference optional on 3 Nov 2026). • Bid submission: electronic only, 25 Nov 2026 3:00 PM EST. • Required bonds: 5 % bid guarantee, 100 % performance and payment bonds. • Insurance: commercial general liability, auto, workers’ comp, pollution liability (minimum limits specified). • Award will be made to the lowest responsive, responsible bidder.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Juan Figueroa(Senior Project Manager)

[email protected]

(954) 921-3930

Key dates

Opened
10/20/2026
Questions due
11/5/2026
Pre-bid meeting
11/3/2026
Closes
11/25/2026
Duration
210 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
IFB-438-26-JM

Budget estimate

$1,000,000 – $3,000,000

Based on the six distinct work elements—lime silo repair, dust collector replacement, sludge drum thickener replacement, storage‑tank valve replacement, and clearwell line replacement—plus associated site preparation, permitting, insurance, bonds, and a 210‑day schedule, the contract is likely to fall in the low‑to‑mid million‑dollar range. Similar municipal water‑treatment refurbishment projects in South‑Florida typically range from $1 M to $3 M depending on material costs, labor rates, and unforeseen site conditions. Therefore a reasonable estimate for the contractor’s revenue is $1,000,000 – $3,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hollywood·Florida

Top match · 94%

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Hollywood·Florida

93% match

Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)

Closes 11/18/2026Opened 9/9/2026

City of Hollywood·Florida

91% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Hollywood·Florida

87% match

Headwork Scrubber Rehabilitation (Project No. 23-9219)

Closes 11/10/2026Opened 10/6/2026

City of Hollywood·Florida

86% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER TREATMENT PLANT PROGRAM MANAGEMENT (PROJECT NO. 26-1351)

Closes 11/10/2026Opened 10/6/2026

City of Hollywood·Florida

86% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

City of Kyle·Texas

86% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

City of Riverside·California

85% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

City of Holly Grove·Arkansas

85% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

City of Panama City·Florida

85% match

Millville Wastewater Treatment Plant Headworks Structure Rehabilitation

Closes 11/13/2026Opened 10/14/2026

City of Neptune Beach·Florida

85% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Hollywood·Florida

84% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER DISTRIBUTION, TRANSMISSION & WASTEWATER COLLECTION PROGRAM MANAGEMENT (PROJECT NO. 26-1352)

Closes 11/17/2026Opened 10/13/2026

City of Eureka Springs·Arkansas

84% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Rosenberg·Texas

84% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Sanibel·Florida

84% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

City of Orange City·Florida

83% match

MAIN WATER TREATMENT PLANT GROUND STORAGE TANK PAINTING

Closes 12/3/2026Opened 10/25/2026

City of Winston Salem·North Carolina

83% match

Mowing & Landscaping Services at Water Treatment Facilities

Closes 11/10/2026Opened 10/19/2026

The Metropolitan Water District of Southern California·California

83% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

City of Stillwater·Oklahoma

83% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

City of Redlands·California

83% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of San Clemente·California

83% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

City of Torrance·California

83% match

Walteria Reservoir Slope Repair, I-181

Closes 12/4/2026Opened 10/28/2026

San Antonio Water System·Texas

83% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

Oregon Clackamas County·Oregon

83% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026