Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Springfield Lake Outlet Channel Restoration

Summit County, Ohio·Ohio

Springfield Lake Outlet Channel Restoration

Closes 10/7/2026$900k – $1.2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a qualified contractor to perform full‑service restoration of the Springfield Lake outlet channel, including sediment removal, channel clean‑up, stabilization, and incorporation of natural stream elements to improve hydraulic performance and reduce flooding. The work is governed by Ohio Department of Transportation specifications and requires compliance with prevailing‑wage, insurance, bonding, and environmental regulations. The contract value is estimated at just over $1 million, with completion required by July 31 2027. • Scope includes clearing, grubbing, excavation, material placement, sub‑grade compaction, geogrid installation, asphalt base, aggregate base, stone placement, tack‑coat, asphalt concrete courses, fence installation, pipe replacement, temporary traffic control, field office, surveying, and extensive storm‑water erosion‑control measures (SWPPP, filter‑sock, seed‑mix). • Contractor must submit a complete bid package through Bid Express, provide a 100 % performance bond, and a bid guarantee (≥ 3 % of bid or full bond). • All work must meet ODOT C&M Specification requirements, prevailing‑wage rules, domestic‑steel mandates, and environmental permits (NPDES, EPA). • The project includes mandatory reporting, weekly inspections, and post‑storm inspections within 24 hours for rainfall ≥ 0.5 in. • Addendum #1 removes several line‑item quantities and provides two approved native wetland seed‑mix options; Addendum #2 shifts tree‑and‑stump removal responsibility to the contractor and extends the Q&A deadline to Oct 2 2026 and bid opening to Oct 7 2026.

Attached files

Contact

Shannon McNulty(Central Purchasing Officer (Bid‑Guarantee Delivery))

Key dates

Opened
9/10/2026
Questions due
10/2/2026
Closes
10/7/2026
Duration
10 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
SWM 2026 - 002 (Solicitation No. 49037)

Budget estimate

$900,000 – $1,200,000

The Engineer’s Estimate for the project is $1,096,242. Assuming typical bid margins of 5‑10 % for civil‑construction work, the contractor’s net earnings would likely fall between roughly $55 k and $110 k. However, the total contract award (gross) is expected to be in the $1.0‑$1.2 million range, reflecting the full scope of material, labor, equipment, and overhead costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Gwinnett County Government·Georgia

Top match · 64%

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Defense·Illinois

63% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

City of Madison·Wisconsin

63% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

Gwinnett County Government·Georgia

62% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Defense·Kentucky

62% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Town of Springfield·Vermont

62% match

Springfield Water Service Hydroexcavation

Closes 11/6/2026Opened 10/12/2026

Lucas County Engineer·Ohio

61% match

2026 Springfield Township Wolf Creek Logjam Removal

Closes 11/10/2026Opened 10/26/2026

Lake County·California

61% match

Abatement of Dilapidated Lakebed Structures #01

Closes 11/6/2026Opened 10/22/2026

County of Ontario·New York

61% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

Virginia Polytechnic Institute and State University·Virginia

61% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Massachusetts City of Newburyport·Massachusetts

61% match

IFB No. 27-07 Bartlet Mall Restoration Project

Closes 12/17/2026Opened 10/28/2026

St. Tammany Parish Government·Louisiana

61% match

Lake D' Este Dr Drainage

Closes 11/10/2026Opened 10/26/2026

City of Prior Lake·Minnesota

61% match

2026-2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

Gwinnett County Government·Georgia

61% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

NYS Ontario County·New York

60% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

City of Fitchburg·Wisconsin

60% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

City of Waukegan·Illinois

60% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

City of Shawnee·Kansas

60% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Farmington·New Mexico

60% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

City Utilities of Springfield·Missouri

60% match

Water Mitigation & Minor Restoration Services

Closes 11/16/2026Opened 10/28/2026

California Grants·California

60% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

Lucas County Engineer·Ohio

60% match

2026 Springfield Township O.P.W.C. Road Improvement Project, Phase 2

Closes 11/10/2026Opened 10/26/2026

Massachusetts City of Springfield·Massachusetts

60% match

27-065: Improvements to Clarendon Street Fountain

Closes 11/18/2026Opened 10/28/2026

Ohio Department of Natural Resources·Ohio

60% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

Washakie County Conservation District·Wyoming

59% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026