Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Virginia guideVirginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Virginia
  4. ›Construction
  5. ›VT Duck Pond Water Quality Improvements – Pond Edge…

Virginia Polytechnic Institute and State University·Virginia

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026$500k – $2MInvitation for Bid
Get bids like this by emailBid source

Description

The project involves full‑scale stabilization and restoration of the Duck Pond shoreline on the Virginia Tech campus. The contractor must furnish all labor, materials, equipment, and services to refresh and stabilize the pond edges for both the upper and lower ponds, install rock ledges, cobble armor, stacked‑boulder toe, and rock toe, manage dewatering, protect existing utilities and the pond liner, and complete native‑plant restoration and a six‑month maintenance period. The scope also includes installation of a 2‑inch conduit, asphalt sidewalk repair, and comprehensive erosion‑control measures. • Shoreline stabilization using locally‑sourced dolomitic limestone (“Hokie Stone”) and engineered rock placement. • Environmental protection: dewatering, liner safeguarding, invasive‑species treatment, and native riparian planting. • Infrastructure work: conduit installation, asphalt repair, utility protection, and provision of temporary site facilities (portable restrooms, dumpsters, parking). • Project schedule tight: start April 19 2027, complete by August 13 2027, with a 6‑month post‑construction maintenance clause. • Contractor must comply with Virginia DEQ permits, Virginia Tech safety standards, and provide Builder’s Risk insurance (no bonds required).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kimberly Widrig(Procurement Officer)

[email protected]

(540) 231-8543

Key dates

Opened
10/6/2026
Questions due
10/20/2026
Pre-bid meeting
10/16/2026
Closes
11/10/2026
Duration
4 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
049302703

Budget estimate

$500,000 – $2,000,000

Based on similar campus shoreline restoration contracts, the project likely falls in the mid‑hundreds of thousands to low‑single‑million dollar range. Factors influencing cost include the volume of limestone rock, equipment mobilization, dewatering pumps, plant materials, and the six‑month maintenance warranty. A reasonable estimate is between $0.5 million and $2 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Polytechnic Institute and State University·Virginia

Top match · 95%

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of Charlotte·North Carolina

82% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

City of Victoria·Minnesota

82% match

2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

Massachusetts City of Newburyport·Massachusetts

81% match

IFB No. 27-07 Bartlet Mall Restoration Project

Closes 12/17/2026Opened 10/28/2026

Department of Buildings & General Services·Vermont

80% match

Kettle Pond State Park Drinking Water System

Closes 11/4/2026Opened 10/7/2026

Department of Buildings & General Services·Vermont

80% match

Mt. Ascutney State Park - South Wastewater System Improvements

Closes 11/13/2026Opened 10/21/2026

City of Prior Lake·Minnesota

80% match

2026-2027 Pond Maintenance Project

Closes 11/19/2026Opened 10/30/2026

North Carolina County of Mecklenburg·North Carolina

80% match

Barlowe Road Flood Mitigation and Water Quality Improvement Project

Closes 11/19/2026Opened 10/26/2026

City of North Charleston·South Carolina

80% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

North Carolina City of Raleigh·North Carolina

79% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

79% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of North Charleston·South Carolina

79% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

City of Charlotte·North Carolina

79% match

University Pond Water Quality Enhancement Project

Rolling / TBD closeOpened 5/14/2026

Town of Southampton·New York

79% match

Royal Avenue North Shoreline Stabilization and Water Quality Improvements

Closes 11/18/2026Opened 10/22/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

79% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

Chittenden County Regional Planning Commission·Vermont

79% match

Ongoing Call: Water Quality Improvement Project Subcontractors

Closes 12/31/2026Opened 12/19/2023

City of Charlotte·North Carolina

78% match

Bruns Academy Water Quality Enhancement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

78% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Framingham·Massachusetts

78% match

Nuisance Aquatic Vegetation Management Services For City Of Framingham’s Ponds And Sudbury River

Closes 11/19/2026Opened 10/28/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

78% match

DCR 931 Lakes & Ponds Design, Assessment and Management

Closes 5/30/2029Opened 3/11/2024

City of Farmington·New Mexico

78% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Massachusetts Town of Bolton·Massachusetts

78% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

Northern Virginia Parks·Virginia

78% match

Pohick Bay 2027 Golf Course Renovations Project Manual

Closes 11/12/2026Opened 10/8/2026

City of Casper·Wyoming

78% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Virginia Department of Energy·Virginia

78% match

Brush Mountain Portals II Project

Closes 11/2/2026Opened 10/27/2026