The City of Dalton, Georgia is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. The project is expected to last approximately 496 days, with a planned delivery date of November 26, 2027.
• The project requires the design and fabrication of electrical equipment for a new power generation plant.
• The scope includes medium-voltage and low-voltage switchgear lineups, as well as engineering submittals and field services.
• The project has a planned delivery date of November 26, 2027.
• The Owner reserves the right to award the project to the Vendor whose bid is determined to be the best overall value for the Owner.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.