Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›Olympic Park - Walkway Repairs Rebid

Miami-Dade County·Florida

Olympic Park - Walkway Repairs Rebid

Closes in 5 days
Get bids like this by emailBid source

Description

"1. Scope of Work – Furnish all labor, equipment and materials required to repair the asphalt walkways and various concrete pads throughout Olympic Park located at 8601 SW 152 Avenue, Miami, FL 33193. The work includes demolition, root pruning, debris removal, base compaction of approximately 865 SF of existing concrete walkway; installation of approximately 865 SF of new concrete walkway; and raising/regrading approximately 1020 SF of existing brick pavers. See below for more details: a. Attachment 1 – Location shows the general location of Olympic Park. Prior to submitting a bid, the contractor is to visit the work site and become familiar with the work. The site is in a county park and can be visited by the contractor at any time during open park hours. b. Attachment 2 – Sketches Location divides the park into 3 sections and shows the locations of Sketch A (north side of the park), Sketch B (central), and Sketch C (south side of the park). c. Attachment 3 – Sketch A; Attachment 4 – Sketch B; and Attachment 5 – Sketch C shows the scope of work for each of the three sections. d. The contractor is required to perform their own site take-off (field measurements) to complete all work. Any dimensions or quantities depicted in this RPQ are approximate and are not to be used for bid purposes. e. The contractor shall abide by the PWD Manual 2 Specifications for Portland cement concrete. Attached are the following specifications: i. PWD Manual Part 1A ii. PWD Manual Part 1B iii. PWD Manual Part 2A iv. PWD Manual Part 2B f. Sketches A, B and C depict the locations of the following work descriptions: i. Replace (Demo Concrete; Root Prune; Regrade/Compact Existing Base; and Install Concrete Walkway) – The Contractor shall saw cut straight the concrete walkway full width at the beginning and end of the removal area. The thickness of the existing concrete walkway is around 6-inches. All of the concrete spoils shall be removed from the site and be properly disposed. The contractor shall root prune, remove the debris, and properly dispose of the debris material. The Contractor shall regrade and compact the base, and install new concrete walkway. The Portland cement concrete shall be a minimum thickness of 6-inches, 3000 PSI with a polypropylene fiber mesh additive, and the finished surface shall have a slip resistant broom finish. The Contractor shall create controlled joints every 8’ along the 8’ wide walkway. The controlled joints shall be either saw cut within 24 hours of the concrete pour or trawled into the wet concrete prior to curing. ii. Temporary Remove Pavers – In Sketch A, the intent of this work is to raise the existing brick pavers that encircle the fitness court to be level and flush to the two concrete ribbons located on both sides of the pavers. Work includes temporarily removing the brick pavers and storing them securely while not breaking them. Pressure wash the brick pavers to clean the surface. Root prune the base (if needed) and remove all organic debris. Add clean sand from a quarry and regrade the base to the proper elevation. Reinstall existing brick pavers. Add addition thin layer of clean sand on top of newly reinstalled existing brick pavers and compact surface with vibratory compactor to lock the pavers. Sweep clean the brick paver surface. The top of the newly installed/compacted pavers shall be flush to the surrounding concrete ribbons. g. Upon completion of the concrete walkways and brick paver work, the contractor shall install 70/30 (sand/soil) mix and sod on all areas that the contractor disturbed due to their construction activities. Use fine hand grading to bring mixture/sod to an elevation approximately 1” to 2” below the top of surface of the broom finished concrete. If there was no grass in the disturbed area prior to work, then the contractor shall place the 70/30 mix at a 3:1 slope to help make the walkway ADA compliant. Sod will only be placed in the areas where grass existed prior to the contractor starting their work. h. The contractor shall protect the park assets at all times, especially the concrete walkways. Any new damage caused by the contractor’s equipment shall be replaced at the contractor’s expense in a similar manner outlined in this RPQ’s scope of work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/8/2026
Closes
11/6/2026

Last updated

Details

Industry
Construction
NAICS
237310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 92%

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

90% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

87% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of St. Petersburg·Florida

80% match

Skate Park Obstacle, Demolition/Replacement

Closes 11/12/2026Opened 10/26/2026

City of Encinitas / San Dieguito Water·California

79% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

Georgia Columbus Consolidated Government·Georgia

79% match

RFB No. 27-0011 Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 11/4/2026Opened 9/1/2026

Columbus Consolidated Government·Georgia

79% match

Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 11/4/2026Opened 9/1/2026

City of Goose Creek·South Carolina

78% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

Camden County·New Jersey

78% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Maryland Baltimore City Department of Transportation·Maryland

78% match

TR-27003 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

Columbus Consolidated Government·Georgia

78% match

Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 11/4/2026Opened 9/1/2026

Georgia City of Brunswick·Georgia

77% match

Howard Coffin Park Swimming Pool Repairs

Closes 11/17/2026Opened 10/22/2026

City of Orlando·Florida

77% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

The City of Doral·Florida

77% match

Swimming Pool Competition Equipment, Anchors, and Deck Improvements (Starting Block & Backstroke Flagpole Anchor Installation)

Closes 11/11/2026Opened 10/5/2026

City of New York Department of Parks & Recreation·New York

77% match

MG-40550-117MA Mannahatta Park Recon

Closes 11/5/2026Opened 10/27/2026

The Village of Royal Palm Beach·Florida

77% match

Crestwood North Park Tennis Fencing Repair

Closes 11/3/2026Opened 10/21/2026

County of Collier, FL·Florida

77% match

Freedom Park Boardwalk Repairs - Boardwalks 1 & 2

Closes 11/6/2026Opened 10/6/2026

City of Englewood·Colorado

77% match

BELLEVIEW PARK ENHANCEMENTS

Closes 11/17/2026Opened 10/15/2026

City of Pembroke Pines·Florida

77% match

Soccer Field and Structural Renovations at Silver Lakes North Park

Closes 11/17/2026Opened 9/17/2026

Nevada Government·Nevada

77% match

PARADISE PARK TENNIS COURT CONVERSION PARADISE PARK DOG RUNS

Closes 11/10/2026Opened 10/14/2026

Maryland Baltimore City Department of Transportation·Maryland

77% match

TR-26006 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

City of Greenacres·Florida

77% match

Parks Court Resurfacing

Closes 11/19/2026Opened 10/19/2026

New York City Department of Parks and Recreation·New York

77% match

MG-40550-117MA Mannahatta Park Recon

Closes 11/5/2026Opened 7/23/2026

Maryland Baltimore City Department of Transportation·Maryland

77% match

TR27002 Reconstruction of Footways Citywide

Closes 11/18/2026Opened 10/24/2026

Brazos Valley·Texas

77% match

CITY GOLF COURSE CART PATH AND HOLE REPAVING

Closes 11/6/2026Opened 10/13/2026