Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›International Gardens Park - Walkway Repairs Rebid

Miami-Dade County·Florida

International Gardens Park - Walkway Repairs Rebid

Closes in 5 days$60k – $70kRequest for Quotation
Get bids like this by emailBid source

Description

The project calls for comprehensive repair and resurfacing of asphalt walkways and concrete pads within International Gardens Park, Miami, FL. The contractor must perform milling, removal, base preparation, new asphalt overlay, seal‑coating, concrete replacement, shoulder repairs, saw‑cutting, and final site restoration with sod and topsoil. All work must follow the County’s Public Works Department Manual specifications, include proper radius transitions, and meet ADA‑compliant grading. • Mill and resurface ~3,400 SF of existing asphalt, applying tack coat and a new Type S‑1 asphalt overlay. • Demolish and replace ~8,200 SF of asphalt walkways, install ~7,100 SF lime‑rock base, prime coat, and place a new asphalt overlay. • Replace concrete walkways/pads (~80 SF) with 6‑inch, 3000 psi Portland cement concrete with slip‑resistant finish. • Perform seal‑coating on ~5,900 SF of asphalt, repair a shoulder near a water fountain, and restore disturbed areas with 70/30 sand‑soil mix and sod.

Attached files

Contact

Penelope Quintas(Bid Submission / Procurement Contact)

[email protected]

Key dates

Opened
10/8/2026
Pre-bid meeting
10/10/2026Mandatory
Closes
11/6/2026
Duration
30 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237990
Solicitation №
RPQ No 2026IRWRR

Budget estimate

$60,000 – $70,000

The solicitation states a lump‑sum contract value of $65,092. Accounting for typical contractor overhead, profit margins, and potential change‑order allowances, the realistic earnings range for a qualified firm would be roughly $60,000 to $70,000. This estimate assumes the contractor can meet the tight 30‑day schedule without major cost overruns.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 95%

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

87% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Miami-Dade County·Florida

87% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of Fort Myers·Florida

81% match

Asphalt Roadway Resurfacing and Rehabilitation

Closes 11/2/2026Opened 10/1/2026

Miami-Dade County Department of Transportation and Public Works·Florida

81% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

Bay County·Florida

80% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

City of Miramar·Florida

80% match

Milling and Resurfacing of Miramar Parkway from SW 172 Ave to SW 184 Ave

Closes 11/19/2026Opened 10/22/2026

Georgia City of College Park·Georgia

80% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Bay County, FL·Florida

79% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Tampa International Airport·Florida

79% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

Department of Parks, Recreation and Tourism·South Carolina

79% match

Golf Course Cart Path Paving-Hickory Knob State Resort Park

Closes 11/11/2026Opened 10/14/2026

City of Orlando·Florida

78% match

Grounds Maintenance for City Easements, Right-of-Ways and Brick Streets

Closes 11/23/2026Opened 10/21/2026

Town of Kershaw·South Carolina

78% match

Stevens Park Community Center Parking Lot Improvements (rebid)

Closes 11/10/2026Opened 10/26/2026

Villages Community Development Districts, FL·Florida

78% match

Districtwide Pavement Rejuvenator Services

Closes 11/17/2026Opened 10/21/2026

City of Vernon·California

78% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Cincinnati·Ohio

78% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

LA Public Works Engineering Bureau·California

78% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Municipality of Anchorage·Alaska

78% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Encinitas / San Dieguito Water·California

78% match

Park Equipment Replacement at Wiro and Orpheus Parks

Closes 11/12/2026Opened 10/15/2026

City of Fort Wayne·Indiana

78% match

0963C - Five Points Neighborhood Concrete Repairs

Closes 11/12/2026Opened 10/29/2026

Ohio Department of Natural Resources·Ohio

78% match

PWC Dillon State Park Asphalt Patching

Closes 11/5/2026Opened 10/16/2026

City of Aurora, IL·Illinois

78% match

Parking Deck Repairs – Downer Place & Galena Boulevard

Closes 11/18/2026Opened 10/28/2026

County of Los Angeles Department of Public Works·California

78% match

RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I

Closes 11/17/2026Opened 10/20/2026

Port of Portland·Oregon

78% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

City of Ormond Beach - Purchasing Office·Florida

78% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026