Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›Construction
  5. ›Portland International Airport Terminal Upper Roadway…

Port of Portland·Oregon

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026$2M – $5MInvitation for Bid
Get bids like this by emailBid source

Description

The Port of Portland is seeking a qualified contractor to repair and replace roadway joints on the terminal upper roadway at Portland International Airport, including the application of a bio‑based asphalt rejuvenator. The work covers selective demolition, concrete casting, steel framing, EPDM gutter rehabilitation, and installation of expansion‑joint covers, all coordinated with ongoing airport operations. • Provide and repair roadway joints on the airport terminal upper roadway. • Apply a bio‑based asphalt rejuvenator per specification 320113. • Perform related construction activities: concrete work, steel framing, EPDM gutter system rehab, and expansion‑joint cover assemblies. • Must submit a 10 % bid bond and 100 % performance and payment bonds; comply with prevailing‑wage, insurance, and apprenticeship requirements. • All bids submitted electronically via PlanetBids by 2 p.m. on November 10, 2026; pre‑bid meeting (optional) on October 14, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brandon Alius

[email protected]

Key dates

Opened
10/7/2026
Questions due
10/30/2026
Pre-bid meeting
10/14/2026
Closes
11/10/2026
Duration
170 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2026-14655

Budget estimate

$2,000,000 – $5,000,000

The solicitation does not disclose a contract ceiling, but similar airport roadway joint replacement projects typically range from $2 million to $5 million based on scope, materials (including a bio‑asphalt rejuvenator), and labor requirements. The estimate assumes a medium‑size contract for a single terminal roadway segment with associated ancillary work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Portland·Oregon

Top match · 89%

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Port of Portland·Oregon

88% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

Port of Portland·Oregon

86% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

City of Boise·Idaho

85% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

Oregon Department of Transportation·Oregon

82% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

Raleigh Durham Airport Authority·North Carolina

82% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Virgin Islands Port Authority·U.S. Virgin Islands

81% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

City of Bangor·Maine

81% match

P27-36 Curb Replacement BGR

Closes 11/18/2026Opened 10/23/2026

Raleigh Durham Airport Authority·North Carolina

81% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Tampa International Airport·Florida

80% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

Raleigh Durham Airport Authority·North Carolina

80% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

Texarkana Regional Airport·Arkansas

80% match

Texarkana Regional Airport – Restore and Reseal Exterior Wood Surfaces

Rolling / TBD closeOpened 9/20/2026

Hillsborough County Aviation Authority·Florida

80% match

GENERAL AVIATION APRON REHABILITATION (TPA)

Closes 11/16/2026Opened 9/29/2026

Texas Department of Transportation·Texas

79% match

TxDOT Aviation Division- Notice to Bidders

Closes 11/17/2026Opened 10/13/2026

City of Chicago·Illinois

79% match

Airside and Landside Concrete and Maintenance for O’ Hare and Midway International Airports

Closes 11/18/2026Opened 10/13/2026

Georgia Decatur County Board of Commissioners·Georgia

79% match

Rehab Terminal Apron

Closes 11/5/2026Opened 10/5/2026

Georgia Savannah Airport Commission·Georgia

79% match

SAC 30639 Gulfstream Road and James Blackburn Drive Rehabilitation

Closes 11/10/2026Opened 10/5/2026

Jacksonville Port Authority·Florida

79% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

Georgia Turner County Board of Commissioners·Georgia

79% match

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

State of Hawaii Department of Transportation – Airports·Hawaii

79% match

CM1530-33 Apron Reconstruction, Phase 1, Kahului airport

Closes 11/16/2026Opened 10/2/2026

LA Public Works Engineering Bureau·California

79% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

City of Long Beach·California

79% match

Rubber & Paint Removal on Airfield Pavements

Closes 11/10/2026Opened 10/6/2026

City of Charlotte·North Carolina

78% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

City of Charlotte·North Carolina

78% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

San Joaquin County·California

78% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026