Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Consulting Services RFPsConsulting Services Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More consulting services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Consulting Services
  5. ›Stockton Metropolitan Airport (SCK) Access Control System…

San Joaquin County·California

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026$500k – $1.5MRequest for ProposalLogin required
Get bids like this by emailBid source

Description

The County of San Joaquin, on behalf of Stockton Metropolitan Airport (SCK), seeks a qualified contractor to fully assess, diagnose, repair, upgrade, and maintain the airport’s Access Control System (ACS) and Video Management System (VMS). The contractor will also act as a subject‑matter expert during the airport’s terminal expansion and perimeter fence replacement projects, providing design review, integration guidance, and rapid response support. The work includes a comprehensive assessment, creation of an action plan with cost estimates, implementation of upgrades, ongoing quarterly preventive maintenance, emergency repairs, and training of airport staff. The contract will span the life of the terminal upgrade and continue as a long‑term maintenance agreement. • Perform full hardware/software assessment of ACS and VMS, produce prioritized repair/upgrade plan. • Provide consulting during terminal redesign and fence replacement to ensure security system integration. • Deliver quarterly preventive maintenance, annual testing, and 24/7 emergency response (max 4 calls per year). • Supply all labor, materials, licenses, certifications (Lenel OnGuard VAR, Milestone Certified Technicians, California C‑7/C‑10/C‑28 licenses). • Maintain documentation, warranty management, and training for airport personnel. • Submit one hard‑copy and one electronic proposal by Dec 18 2026; attend mandatory pre‑bid conference/site visit on Nov 12 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Stephany Pacheco(Purchasing Assistant)

[email protected]

(209) 468-3253

Key dates

Opened
10/30/2026
Questions due
11/18/2026
Pre-bid meeting
11/12/2026Mandatory
Site visit
11/12/2026Mandatory
Closes
12/18/2026
Projected award
1/19/2027

Last updated

Details

Type
Request for Proposal
Industry
Consulting Services
NAICS
541512
Solicitation №
26319

Budget estimate

$500,000 – $1,500,000

The solicitation does not disclose a budget. Similar airport security system assessments, upgrades, and multi‑year maintenance contracts for midsize regional airports typically range from $500,000 to $1,500,000 depending on scope, equipment costs, and labor rates. Factors influencing the final amount include the number of doors/gates (≈21), cameras (≈40), required software licenses, emergency response provisions, and the length of the maintenance term. A conservative estimate places the total contract value between half a million and one‑and‑a‑half million dollars.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Diego County Regional Airport Authority·California

Top match · 85%

Audio Visual Preventative Maintenance and On-Call Services

Closes 11/18/2026Opened 10/19/2026

County of Sacramento·California

85% match

Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project

Closes 12/1/2026Opened 9/10/2026

City and County of San Francisco·California

84% match

EXT AIR | As-Needed Airport Conveyance Maintenance

Closes 6/30/2029Opened 4/25/2024

City of Cleveland·Ohio

84% match

576 - Traffic Signal Maintenance

Closes 11/9/2026Opened 11/14/2025

Raleigh Durham Airport Authority·North Carolina

82% match

Elevator, Escalator, and Moving Walkway Maintenance Services

Closes 11/12/2026Opened 10/14/2026

City of Colorado Springs·Colorado

82% match

Elevator & Escalator Maintenance for Colorado Springs Airport

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

82% match

Advance Cockpit System (ACS) LTC

Closes 11/20/2026Opened 10/20/2026

Central Florida Tourism Oversight District·Florida

82% match

Traffic Management System Maintenance

Closes 11/24/2026Opened 10/30/2026

Horry County·South Carolina

82% match

MYR- TSA Screening Checkpoint Expansion

Closes 11/4/2026Opened 9/25/2026

San Francisco International Airport·California

82% match

RFQ 50379 As-Needed Airport Conveyance Maintenance and Repair Services

Closes 6/30/2029Opened 4/25/2024

City of Santa Fe, NM·New Mexico

82% match

Airport Security Coordinator (ASC) On-Call Services - Santa Fe Regional Airport

Closes 11/16/2026Opened 11/3/2026

Georgia Bulloch County Board of Commissioners·Georgia

82% match

Airport Consulting Services - Engineering

Closes 12/3/2026Opened 10/29/2026

San Francisco County·California

82% match

EXT AIR | As-Needed Airport Conveyance Maintenance

Closes 6/30/2029Opened 4/30/2024

U.S. Department Of Defense·Massachusetts

82% match

Hanscom Aero Club Automated Fuel Management System Replacement

Closes 11/6/2026Opened 10/16/2026

San Diego County Regional Airport Authority·California

82% match

Quieter Home Program Phase 14 Group 12

Closes 11/12/2026Opened 10/12/2026

State Technical College of Missouri·Missouri

82% match

1H3 Airport Notice-to-Airport-Consultants

Closes 11/13/2026Opened 10/28/2026

Memphis-Shelby Airport Authority·Tennessee

81% match

DeWitt Spain Exterior Improvements

Closes 11/23/2026Opened 10/6/2026

Tampa International Airport·Florida

81% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

Raleigh Durham Airport Authority·North Carolina

81% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

San Diego County Regional Airport Authority·California

81% match

On-Call Electrical Services

Closes 12/2/2026Opened 10/29/2026

Bill and Hillary Clinton National Airport·Arkansas

81% match

Airport Service Development Consultant

Closes 12/2/2026Opened 10/31/2026

California Department of Highway Patrol·California

81% match

IFB 26C091005 - Hangar Door Hydraulic System Upgrade Services - CHP Academy Special Weapons and Tactics (SWAT)

Closes 11/23/2026Opened 10/28/2026

California Department of General Services·California

81% match

CONTRACT:26-337609; DSH ATASCADERO ELECTRICAL UPGRADES; DEPARTMENT OF STATE HOSPITALS; ATASCADERO, SAN LUIS OBISPO COUNTY, CALIFORNIA; PROJECT:142452A

Closes 11/18/2026Opened 10/9/2026

NYS OGS Design & Construction - Consultant Procurement·New York

81% match

Provide Aircraft Maintenance Facility – Stand‑Alone PHASED Contract

Closes 11/2/2026Opened 10/5/2026

City of Philadelphia·Pennsylvania

81% match

Police Helicopter Maintenance

Closes 11/4/2026Opened 10/19/2026