Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›Construction
  5. ›Portland International Airport Taxiway K West Gates E3 to…

Port of Portland·Oregon

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes in 3 days$5M – $12MInvitation for Bid
Get bids like this by emailBid source

Description

Port of Portland is seeking bids for the reconstruction and rehabilitation of Taxiway K west of Gates E3‑E6, including the adjacent vehicle service road, at Portland International Airport. The work encompasses full‑depth asphalt removal and replacement, installation of new centerline lighting, conduit, conductors, and pavement markings, as well as rehabilitation of the taxiway ramp. The contract will be awarded to a qualified general‑construction contractor with experience in airport pavement and lighting systems, subject to FAA and state regulations. • Full‑depth asphalt reconstruction of Taxiway K (Gates E3‑E6) and the vehicle service road (Gates D13‑E2). • Installation of new airfield lighting, underground power cable, conduit, grounding, and signage. • Required compliance with FAA AC 150/5370‑2G, prevailing‑wage, DBE, Buy‑American, and safety/environmental plans; with a 35‑day window for key work areas and overall completion by 27 Aug 2027. • Bid submission electronically by 4 Nov 2026, pre‑bid meeting (virtual) on 15 Oct 2026, and a Q&A cutoff on 26 Oct 2026. • Contractor must provide 10 % bid bond, performance/payment bonds, insurance, and meet a 25 % self‑performance requirement with a 20 % apprentice labor target.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brandon Alius

[email protected]

Key dates

Opened
10/8/2026
Questions due
10/26/2026
Pre-bid meeting
10/15/2026
Closes
11/4/2026
Duration
4 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2026-14617

Budget estimate

$5,000,000 – $12,000,000

While the solicitation does not disclose the contract value, similar airport taxiway reconstruction projects in the Pacific Northwest typically range from $5 million to $12 million, depending on pavement area, lighting scope, and contingency allowances. The estimate assumes approximately 75 ft wide by 1,000 ft length of taxiway plus associated service‑road work, at $70–$150 per square foot for full‑depth asphalt and ancillary systems. Therefore, a realistic earnings range for the contractor is roughly $5 M–$12 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Portland·Oregon

Top match · 93%

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

Port of Portland·Oregon

88% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

Raleigh Durham Airport Authority·North Carolina

87% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

City of Boise·Idaho

86% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

Little Rock Municipal Airport Commission·Arkansas

85% match

4R-22L RUNWAY AND TAXIWAY LIGHTING REHABILITATION

Closes 11/18/2026Opened 10/11/2026

Port of Portland·Oregon

85% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

Raleigh Durham Airport Authority·North Carolina

85% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Raleigh Durham Airport Authority·North Carolina

84% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Texas Department of Transportation·Texas

84% match

TxDOT Aviation Division- Notice to Bidders

Closes 11/17/2026Opened 10/13/2026

City of Charlotte·North Carolina

84% match

Runway 18/36 and Taxiway Delta Rehab Construction

Rolling / TBD closeOpened 12/14/2026

Virgin Islands Port Authority·U.S. Virgin Islands

83% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

U.S. Department Of Defense·Virginia

83% match

Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·South Carolina

83% match

PSTE 162013 Repair and Widen Taxiways, Phase III

Closes 1/29/2027Opened 1/29/2026

Georgia Turner County Board of Commissioners·Georgia

83% match

Turner County Airport � Apron/Stub Taxiway Rehabilitation Project

Closes 11/17/2026Opened 10/16/2026

Massachusetts Town of Montague·Massachusetts

83% match

Turners Falls Municipal Airport - Realign Taxiway A1 and Reconstruct Pioneer Apron

Closes 11/11/2026Opened 10/21/2026

U.S. Department Of Defense·South Carolina

83% match

Repair Taxiway Alpha & Bravo - North Auxiliary Airfield

Closes 12/2/2026Opened 10/30/2026

Georgia Savannah Airport Commission·Georgia

82% match

SAC 30639 Gulfstream Road and James Blackburn Drive Rehabilitation

Closes 11/10/2026Opened 10/5/2026

City of Slidell·Louisiana

82% match

27-B009 Taxilane Mill and Overlay

Closes 11/10/2026Opened 10/7/2026

Tampa International Airport·Florida

81% match

General Aviation Apron Rehabilitation

Closes 11/16/2026Opened 9/30/2026

San Joaquin County·California

81% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026

Panola County Board of Supervisors·Mississippi

81% match

Northwest Community College School of Aeronautics Taxilane Connector Project

Closes 11/3/2026Opened 10/12/2026

Texas Department of Transportation·Texas

81% match

TxDOT Aviation Division- Notice to Bidders

Closes 12/10/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

81% match

FY26 PROJECT WWXT240800 MULTI-PURPOSE APRON AND TAXIWAY, ROYAL AUSTRALIAN AIR FORCE (RAAF) BASE TINDAL, AUSTRALIA

Closes 12/17/2026Opened 9/28/2026

Sanford Airport Authority·Florida

81% match

Taxicab Concession Services

Closes 11/4/2026Opened 10/5/2026

Oregon Clackamas County·Oregon

80% match

BID 2026-82 NE Miley Road at NE Airport Road Intersection Improvements Project

Closes 12/2/2026Opened 10/29/2026