Preferred Construction will be bidding forSingle Prime: Furnish and Install New Pre-Engineered Buildings with Foundations
Goal Requirements SDVOB Goal: 6%; MWBE Goal: 30%:
This is a Prevailing Wage – Tax Exempt Project – OSHA CARDS NEEDEDRequested by: Monday August 10
Insurance Coverage:
Commercial General Liability Insurance$1 Million per occurrence / $2 million general aggregate$1 Million Products and Completed Operations$1 Million Personal Injury Liability
Owners Contractors Protective (OCP) Insurance:$1 Million per occurrence / $2 million general aggregate
Excess Liability Insurance:$5 Million
Professional (Errors & Omissions) Liability Insurance$1 Million per occurrence / $1 million general aggregate (Insurance Coverage in spec book 00100-10 to 00100-15)
Architect in Charge: Suffolk County Water Authority3525 Sunrise HighwayGreat River, NY 11739
Construction Manager in Charge: TBDRFI Deadline – August 7, 2026 at 9:00am
Project Locations:
7 Foxcroft Lane, East Patchogue, NY 11772282 Blue Point Road West, Holtsville, NY 11742174 Hawkins Road, Centereach, NY 11720276 Jayne Boulevard, Terryville, NY 11776457 Boyle Road, Selden, NY 117841015 Station Road, North Bellport, NY 11713232 Kings Park Road, Commack, NY 11725395 Oxhead Road, Stony Brook, NY 11790145 North Washington Avenue, Centereach, NY 11720
Bid Break downPlease include the below “Breakout Costs” for the following project components.
Contract Breakdown: per building
Single-Bay PEMB: 7 Foxcroft Ln., East Patchogue
Double-Bay PEMB: 282 Blue Point Rd. West, Holtsville
Double-Bay PEMB: 174 Hawkins Rd., Centereach
Triple-Bay PEMB: 276 Jayne Blvd., Terryville
Triple-Bay PEMB: 457 Boyle Rd., Selden
Triple-Bay PEMB: 1015 Station Rd., North Bellport
Double-Bay PEMB: 232 Kings Park Rd., Commack
Triple-Bay PEMB: 395 Oxhead Rd., Stony Brook
Double-Bay PEMB: 145 North Washington Ave., Centereach
UNIT Pricing Unit Price 1 : One PEMB extension, Lump Sum
Unit Price 2 : Additional Concrete Work per location, 100 CY
Unit Price 3 : Excavate & Dispose of Unsuitable Material per location, 200 CY
Click THIS LINK for Dropbox to Plans and Specifications
Scope of BidThe fabrication, delivery, and erection of multiple Pre-Engineered Metal Buildings in varying sizes,the construction of a reinforced concrete foundation designed by the Owner,and miscellaneous work as shown on the Drawings and as required by the Specifications.
ScheduleTentative Contract Award: TBDSubmittals/Shop Drawings: TBDConstruction starts: TBDSubstantial completion: 160 – 220 CCD per site, dependent on building typeFinal Punch List/ Closeout: TBD
Please contact Estimating at
[email protected] with any questions.Unfortunately, we are not always in the office. We will respond to ALL emails.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
Total MWBE Goals: 30.00%